
20
S T E P
7
Be careful to assemble all components
in the sequence they are presented.
A.
Slide Adjustable Arm (P) into Pivoting Frame (B) and hold in place using Pop
Pin (33).
B.
Secure Adjustable Arm (P) using:
One 17 (M6x10mm socket head bolt)
C.
Slide Leg Hold Down (R) into the opening on Main Frame (A) and hold in place
by installing Rubber Sleeves (37).
D.
Insert Round End Cap (50) into both sides of Leg Hold Down (R).
E.
You may now tighten all hardware on the unit.
F.
Congratulations!! The installation of your GAB300 is complete.
Содержание GAB300
Страница 9: ...9 S T E P 1 Above shows Step 1 assembled and completed ...
Страница 11: ...11 S T E P 2 Above shows Step 2 assembled and completed ...
Страница 13: ...13 S T E P 3 Above shows Step 3 assembled and completed ...
Страница 15: ...15 S T E P 4 Above shows Step 4 assembled and completed ...
Страница 17: ...17 S T E P 5 Above shows Step 5 assembled and completed ...
Страница 19: ...18 S T E P 6 Above shows Step 6 assembled and completed ...
Страница 21: ...21 S T E P 7 Above shows Step 7 assembled and completed ...
Страница 31: ...31 E x p l o d e d V i e w ...