6
Chapter 4
.
Product Operations Guide
Chapter 3. Machine Installation
After purchasing this equipment, make installation and initial system testing.
3.1
.
Install Handpiece Stand
1). Install handles
2). Connect power line,foot pedal
3.2. Fill Water And Change Water
1). Insert water nozzles to overflow water hole and add water hole
2). Use pipe and Funnel to add water in machine tank
3). Pay attention to water level window and when water flow out, it’s ok
4.1. Turn On The Equipment
4.2. Initialization Interface
Connect the power line,make the air switch up,press the emergency button.
First time using machine,turn on machine and turn off three times,the third time
turn on it and keep 30s.
Power switch on
,
into “Welcome” interface.
(
Figure 1
)
(
Figure 1
)