II - Installation for synchronisation with the main scoreboard
It is possible to synchronise the BTX6002 with the BT6000 main keyboard (stop the game clock and the 30 sec simulta
-
neously).
1/ Open up the horn box.
2/ Disconnect the 4 wires and remove the DIN (A) connector. Replace it by the cable gland.
3/ Feed the Data cable (2 wires) coming from the main scoreboard (D) through the gland and connect it on the
terminal block (E) (white wire RT+ and brown wire RT-) of the electronic card inside the horn box.
4/ Close the horn box.
5/ Connect the shot clock keyboard do the main keyboard.
6/ Connect the power cord to (C).
The Horn box must imperatively be located outside the 0, 1 and 2 volumes (off water zone) at
no less than 3.5m from the pool side.
C