
63
the below schedule.
Starting and Operating Instructions
● Before starting the engine, be sure
that the driver is seated properly in
the UTV and tighten the seat belts.
● Testing the UTV in an open place at
the beginning to learn how to start,
turn and stop.
● Operate the UTV slowly until you are
familiar with it.
● The turning radius of this UTV is small
and agile, so the centrifugal force is
very high when turning at high speed.
Slow down to a more controllable
speed when turning to prevent the
UTV from rolling over.
● To prevent vehicle from rolling over,
be sure to only turn the vehicle at a
slow more controllable speed.
PRE-OPERATION CHECKS
Before using this vehicle, check the
following points
! WARNING
POTENTIAL HAZARD
Failure to inspect the vehicle before
operating. Failure to properly maintain
the vehicle.
WHAT CAN HAPPEN
I
ncreases
the
possibility
of
an
Содержание APU08E
Страница 11: ... 11 Engine and Vehicle Identification Number Location ...
Страница 14: ... 14 1 3 ...
Страница 15: ... 15 ...
Страница 16: ... 16 2 4 6 ...
Страница 17: ... 17 5 7 8 ...
Страница 25: ...25 DESCRIPTION AND VEHICLE IDENTIFICATION 1 2 3 4 5 6 7 8 10 14 11 13 12 9 15 16 17 18 19 20 ...
Страница 33: ...33 ...
Страница 34: ...34 Indicators Display ...
Страница 35: ...35 ...
Страница 39: ...39 ...
Страница 91: ...91 could occur ...
Страница 100: ...100 ...
Страница 128: ...128 ...
Страница 129: ...129 ...
Страница 130: ...130 ...
Страница 131: ...131 ...
Страница 132: ...132 ...
Страница 133: ...133 ...
Страница 138: ...138 ...
Страница 146: ...146 ...
Страница 157: ...157 Electrical schematic ...
Страница 158: ...158 ...