blupura PANTAREI Скачать руководство пользователя страница 15

 15

Installation

Unpacking

Remove the two plastic tape. Remove the 
cardboard box and the internal protective 
packaging by sliding them up and over 
the top. 

Once you have unpacked the unit, ensure 
that it is not damaged. You must inform 
the reseller about any damages as soon 
as possible after delivery.

If the unit has been shipped horizontally 
or at an angle, it will be necessary to wait 
at least 8 hours before setting it up, in 
order to allow the cooling circuit to reset 
itself.

Ensure that the unit is installed and 
connected to the main supply by a 
qualified technician in compliance with 
the manufacturer’s instructions and the 
local safety guidelines.

The end user is not permitted to access 
the internal service parts of the unit. Only 
technical personnel should carry out 
operations of this nature.

Siting the unit 

Wear safety gloves when handling the 
unit. Take care when touching the metal 
parts, which could be sharp.

Site the unit away from sources of heat. 
Leave at least 4 inch around the unit to 
allow for aeration.

Mount the swan neck tap (2) putting it into 
the bayonet. Insert the tap (2) by screwing 
it clockwise into its housing and secure it 
with the screw located on the base (3).

Fig. 15.2

Fig. 15.1

1

2

Содержание PANTAREI

Страница 1: ...1 6 0 0 5 1 1 6 0 5 EN PANTAREI Us e M a i n t e n a n c e M a n u a l...

Страница 2: ......

Страница 3: ...CIATIONS 7 INTERNATIONAL AWARDS 7 PRECAUTIONS AND GENERAL RECOMMENDATIONS 8 DESCRIPTION OF THE UNIT 9 TECHNICAL FEATURES 12 INSTALLATION 15 INSTALLATION OF THE CO2 CYLINDER FIZZ MODEL 18 HANDLING THE...

Страница 4: ...URA product We have designed and manufactured this product with great care to ensure that it will dispense water of the highest quality In order to get the most out of your water cooler please read th...

Страница 5: ...t should not be treated as domestic waste but should be taken to a dedicated recycling centre for electrical and electronic equipment Immediately prior to scrapping cut off the power cable For more in...

Страница 6: ...inisterial Decrees 174 of 06 04 2004 and 25 of 07 02 2012 Electrical safety This water cooler is designed manufactured and marketed in compliance with the safety objectives of the Low Voltage Directiv...

Страница 7: ...RDS 2015 ROME 2014 BEST PROMOTION OF HEALTH AND HYDRATION EUROPEAN AQUA AWARDS 2014 BUDAPEST 2013 BEST PRODUCT INNOVATION EUROPEAN AQUA AWARDS 2013 BERLIN 2012 BEST ENVIRONMENTALLY FRIENDLY PRACTICE E...

Страница 8: ...rant circuit are not damaged The unit is not intended for use by children If the power cable is damaged it must be replaced by the manufacturer by its technical support service or by a qualified techn...

Страница 9: ...d natural materials like ecological gas high quality construction front opening Tank type ice bank with internal coil Entirely made of AISI 316 stainless steel Cabinet and drainer in stainless steel H...

Страница 10: ...2 1 6 5 2 3 5 4 6 Front panel security lock Still water dispensing swan neck tap removable or sparkling water tap removable Stainless steel sink Water dispensing bubbler tap removable Removable stainl...

Страница 11: ...11 1 2 Rear view 1 2 Sink drain 18mm Power cable...

Страница 12: ...12 Technical Features Technical Data Plate 13 Year of manufacture 12 Month of manufacture 00000 Serial number mod Pantarei...

Страница 13: ...13 Technical Features dimensions mm mod Pantarei Dimensions Mod PANTAREI Mod PANTAREI FIZZ L x W x H mm 310 x 310x h 1270 310 x 310 x h 1270...

Страница 14: ...t Power supply Single phase 230V 50Hz Power consumption 185 W 205 W Pump 150 W Cooling Forced ventilation Refrigerant gas HFC R290 Ambient cooling temperature Min 5 C Max 35 C Sound pressure level 70d...

Страница 15: ...stalled and connected to the main supply by a qualified technician in compliance with the manufacturer s instructions and the local safety guidelines The end user is not permitted to access the intern...

Страница 16: ...the sink drain using the supplied tube 2 The unit is NOT equipped with a water pressure reducer that must be assembled upstream The non return valve is included Once the pipes are attached turn on the...

Страница 17: ...s the pump for filling the carbonator with water is also activated Use the tap in order to release any air in the circuit and to allow the pump to fill the carbonator with water After around 1 2 minut...

Страница 18: ...the same size To increase or decrease the level of carbonation of the water you need to adjust the screw 1 Turning it clockwise increases the level of carbonation We recommend that you do not exceed 4...

Страница 19: ...r cylinders or surfaces dropping the cylinders or subjecting them to mechanical stress All of the above may compromise their integrity and resistance The cylinders must not be lifted by the cap or dra...

Страница 20: ...taminants such as asbestos fibres and micro organisms such as Cryptosporidium and Giardia It protects gaskets pumps tubes and valves against blockages corrosion and abrasions Approved by the Italian M...

Страница 21: ...pressure 0 5 bar Maximum pressure 9 bar Radiation 30 000 Ws cm2 Green LED ON bulb is on Maximum duration of the bulb 9 000 hours 12 months The UV sterilizer is made entirely in Italy and complies wit...

Страница 22: ...d technical personnel who have completed specific training courses on hygiene and sanitization To sanitize the unit we recommend the use of hydrogen peroxide oxygenated water 5 diluted in drinking wat...

Страница 23: ...NOT USE alcohol or solvent based products or excessively acidic solvents that can ruin the surface of the steel Cleaning the sink When it is necessary to clean the sink use a diluted limescale cleane...

Страница 24: ...24 Service history Installation Technician Date Notes Signature Maintenance Technician Date Notes Signature...

Страница 25: ...e free of charge replacement of any parts that have been shown to have manufacturing defects The warranty does not include normal wear and tear to the components or any damage caused to the components...

Страница 26: ......

Страница 27: ...160051 Rev 00 18 04 2017 16 56...

Страница 28: ...ura srl Registered office Via F lli Brancondi 56 60025 Loreto AN Italy Headquarters Via Erideo Marinucci 2 4 62019 Recanati MC Italy Tel 39 071 9710080 Fax 39 071 9710084 info blupura com www blupura...

Отзывы: