background image

                                                                                   

 

System Installation of Evaluation Kit

 

24 

 

4.2

 

  Erase Flash Procedure 

 

(1)

 

The same process as procedure programming. After connected to EVK by J-Flash, follow the 
stpes as below, or press [F4], to erase Flash.

 

 

(2)

 

When erase completed, it will be as below. 

 

 

Содержание BX2400-dRF0xp-S1c

Страница 1: ...29 BlueX Microelectronics Co Ltd Bluetooth 5 0 LE MESH SoC System Installation of Evaluation Kit BX2400 dRF0xp S1x BX2400 eRF01e G1x Version 1 7 Aug 11th 2021 released http www bluexmicro com ...

Страница 2: ...on 9 2 Tools Download 10 3 Tools Installation 3 1 Keil Installation 10 3 2 Environment Variables Setting 12 3 3 J Link Installation 14 4 J Link Introduction 4 1 Procedure Programming 16 4 2 Erase Flash Procedure 24 4 3 Degug and Check the Log 25 5 Revison History 28 6 Appendix 6 1 Schematic of BX2400 dRF0xp S1c 29 6 2 Schematic of BX2400 eRF01e G1 30 6 3 Schematic of BX2400 eRF01e G1a 31 ...

Страница 3: ...ower switch Status listed as below 2 Switch 9 Switch EVK Power Module Voltage Up Up 2ea AA batteries 3 0V Down Up 2ea AA batteries 3 0V Up Down DC 5V from 3 4 2V Down Down DC 5V from USB 4 2V According to operating voltage ranging from 2 3V to 3 6V please be noticed it can only be using 2ea AA batteries when BX2416 module on EVK 3 D5V External Power Connector A External power input port DC 5V 4 RF...

Страница 4: ...activated from UART0 P12 TX P13 RX for firmware download Down Chip activated from Flash Mid P23 Down When using chips RF08 on module switch this down before power on Right Watchdog Up Watchdog timeout period is around 25sec and module will reset afterwards Down Switch down when no using it If there s no Watchdog IC welded on EVK no need to concern this switch 15 Circuit Connector P10 P11 P21 A P10...

Страница 5: ...pply 3 3V LDO 4 Jumper Terminal A Separate VDD_BAT and LDO If unplugged VDD_BAT and 3 3V LDO are disconnected using for checking overall power consumption current 5 Battery Terminal A VDD_BAT on the left GND on the right B Should be in alliance with items 4 When connected 4 battery supplies RF01 through LDO When not connected battery supplies RF01 directly 6 IO External Connector pinout as below ...

Страница 6: ...or A P12 TXD P13 RXD 9 P16 P23 DIP Switch A P16 on the left P23 on the right B Same as EVK of BX2400 dRF0xp S1a Please refer to 14 in paragraph 1 1 above 10 Button and LED A KEY P15 P17 LED P02 P03 No special default and it s configuarable for user 11 SPI Flash IC A CS P24 DO P27 WP P28 HOLD P29 CLK P25 DI P26 ...

Страница 7: ...G1a This EVK is applicable to RF01 Items 1 to 10 will be introduced as below 1 RF01 QFN52 6 6mm 2 External Antenna Mount 3 RGBW LED A IO connect as below 4 IO External Connector A Pinout as below B VDD_3V_0 means 3 3V LDO output power supply for RF01 VDD_BAT 1 2 PIN ...

Страница 8: ... A CS P24 DO P27 WP P28 HOLD P29 CLK P25 DI P26 7 Power Supply 3 3V LDO 8 P16 P23 DIP Switch A P16 on the left P23 on the right B Same as EVK of BX2400 dRF0xp S1a Please refer to 14 in paragraph 1 1 above 9 Button A IO connect as below 10 Type C USB Connector A USB 5V power input B It provides USB to convert to UART and links to UART P12 P13 connector on module ...

Страница 9: ...fixed when processing B SPIM0 uses P02 CS1 P03 CS0 P04 CLK P05 MISO and P06 MOSI C SPIM1 uses P07 CS1 P08 CS0 P09 CLK P10 MISO and P11 MOSI D SPIS uses P03 CS P04 CLK P05 MISO and P06 MOSI 4 I C A Equipped with I C 2 channels configuration available from P02 to P23 5 PWM A Supports PWM 5 channels at the most configuration available from P02 to P23 6 ADC A Supports 6 channels of ADC data acquisitio...

Страница 10: ...2 Tools Download Please download the version of Keil 5 0 and J Link 6 3 at least 3 Tools Installation 3 1 Keil Installation 1 Click the installation 2 Click Next 3 Check I agree all the terms of the preceding License Agreement then click Next ...

Страница 11: ...System Installation of Evaluation Kit 11 4 Select the destination and click Next 5 Fill in information and click Next 6 Wait for installing ...

Страница 12: ...System Installation of Evaluation Kit 12 7 Click Finish when it completes 3 2 Environment Variables Setting 1 Right click on My computer and choose Properties 2 Choose Advance System Settings ...

Страница 13: ...m Installation of Evaluation Kit 13 3 Click Enviroment Variables 4 Choose Path and then click Edit 5 Choose bin file under Keil and click OK to set 6 Click Confirm and complete environment variables setting ...

Страница 14: ...System Installation of Evaluation Kit 14 3 3 J Link Installation 1 Click the installation 2 Click Next 3 Click I Agree 4 Click Install Please install it in the default destination and DO NOT revise ...

Страница 15: ...System Installation of Evaluation Kit 15 5 Wait for installing 6 Click Finish to complete ...

Страница 16: ... be version 9 0 at least 4 1 Procedure Programming Taking SDK 3 x for example download link as below https www bluexmicro com download cid 6 html 1 Option 1 Download by J Flash A Find BlueX file and JLinkDevices xml under path of SDK3 tools bluex prog_tool_v2 as below B Copy BlueX file and JlinkDevices xml to J Link file as below ...

Страница 17: ...le under J Link please follow steps as below First click JLinkDevices xml file under SDK3 x Then copy content of Device in between B Third open JLinkDevices xml file from J Link and paste it above DataBase C Click to open J Flash V6 44f and click File to choose New Project as below ...

Страница 18: ... Project click the button indicated by red arrow as below E Roll down to choose BlueX F Choose program according to Module Flash voltage then click OK Choose Apollo_00_3V3 when using RF01 RF03 RF04 BX2416 BX2417 BX2418 Module or Apollo_00_1V8 when using RF08 ...

Страница 19: ...aluation Kit 19 G Back to Create New Project to choose 4000kHz and click OK H When configuration completed click File then Open data file to select the firmware in hex file to download I After selection J Flash will be as below ...

Страница 20: ...ion of Evaluation Kit 20 J Connect EVK through J Link SWD connector and click Target to choose Connect K When connection success it will be as below L Click Target to choose Produciton Programming to download firmware ...

Страница 21: ...llation of Evaluation Kit 21 2 Option 2 Download by Keil A Copy APOLLO_00_1V8 FLM and APOLLO_00_3V3 FLM of BlueX file to the path under Keil_v5 ARM Flash as below B Follow the steps indicated in red arrow as below ...

Страница 22: ...ad D Follow the steps as below Choose Apollo_00_3V3 when using RF01 RF03 RF04 BX2416 BX2417 BX2418 Module or Apollo_00_1V8 when using RF08 E Before using this option first download bootloader of hex file by using J Flash e g template_with_bootloader hex from SDK 3 x programming ...

Страница 23: ...System Installation of Evaluation Kit 23 F When connected to EVK by J Link procedures can be downloaded to EVK by the Load button indicated in red arrow as below ...

Страница 24: ... of Evaluation Kit 24 4 2 Erase Flash Procedure 1 The same process as procedure programming After connected to EVK by J Flash follow the stpes as below or press F4 to erase Flash 2 When erase completed it will be as below ...

Страница 25: ...click Start Debug and make sure J Link is well connected during debugging 2 Check Log by RTT Viewer A To output Log print IC should be programmed with log enabled firmware first B In SDK 3 x there re 2 macro definitions in bx_sys_config h to setup Log Follow the steps as below to activate RTT Log ...

Страница 26: ...bugging To reduce power consumption during sleep mode please define DEBUGGER_ATTACHED as 0 after debugging D After adjustment above use Keil to compile and program firmware to EVK then use RTT Viewer to check the Log E Check RTT Viewer F In configuration we need to setup Specify Target Device by choosing APOLLO_00_1V8 or APOLLO_00_3V3 Next choose SWD and 4000kHz in Target Interface Speed Then choo...

Страница 27: ...System Installation of Evaluation Kit 27 G RTT Log as below ...

Страница 28: ...ENK 2020 02 05 淡明洁 1 2 Amended content of debug 2020 03 03 夏杰 1 3 Amended content of EVK and cover added index 2020 07 17 简任锋 1 4 Updated content of EVK added appendix 2021 01 18 简任锋 1 5 Amended Chapter4 and updated pictures 2021 06 11 简任锋 1 6 English version update 2021 06 16 Michelle 1 7 Added BX2400 eRF01e G1a diagram and EVK introduction 2021 08 11 简任锋 ...

Страница 29: ...29 6 Appendix 6 1 Schematic of BX2400 dRF0xp S1c ...

Страница 30: ...30 6 2 Schematic of BX2400 eRF01e G10 ...

Страница 31: ...31 6 3 Schematic of BX2400 eRF01e G1 ...