INSTALLATION GUIDELINES
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate position of swing frame.
Detail A
Top Bar
STEP 2
Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in
the bottom of each hole.
STEP 3
Select arched swing frame ends, top bar and four set screws. Set swing frame ends into place in footing
holes and brace into position. Slide top bar over swing frame end stubs and hold top bar in place with
pre-drilled holes and nuts at the 6:00 position. Secure using two set screws. Repeat for other end (see
Detail A).
STEP 4
Verify that swing frame is level and plumb in footings and that it is at correct height.
NOTE:
Center of top
rail needs to be 96” above finished surfacing. Pour concrete in footings to correct level.
NOTE:
Concrete
must have a minimum rating of 2,500 psi and must be mixed per manufacturer’s recommendations. Fill
remainder of hole with dirt. Allow concrete to harden for at least 48 hours before use! For safety reasons,
do not attach swing chains or seats to swing frame until playground is ready to open.
NOTE:
Swing seats
and chains sold separately.
Arched Swing
Frame End
Set Screw
1/2”x3/4”