INSTALLATION GUIDELINES

STEP 1 

Refer to PLAN VIEW and FOOTING LAYOUT to locate position of swing frame.

Detail A

Top Bar

STEP 2

Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in 

the bottom of each hole.

STEP 3

Select arched swing frame ends, top bar and four set screws. Set swing frame ends into place in footing 

holes and brace into position. Slide top bar over swing frame end stubs and hold top bar in place with 

pre-drilled holes and nuts at the 6:00 position. Secure using two set screws. Repeat for other end (see 

Detail A).

STEP 4

Verify that swing frame is level and plumb in footings and that it is at correct height. 

NOTE:

  Center of top 

rail needs to be 96” above finished surfacing. Pour concrete in footings to correct level. 

NOTE:

  Concrete 

must have a minimum rating of 2,500 psi and must be mixed per manufacturer’s recommendations. Fill 

remainder of hole with dirt. Allow concrete to harden  for at least 48 hours before use! For safety reasons, 

do not attach swing chains or seats to swing frame until playground is ready to open. 

NOTE: 

 Swing seats 

and chains sold separately.