May 2007
Blue
Sky
Network
100236
D1000C IRIDIUM SATCOM DATA SOLUTION
Page
21
SYSTEM PERFORMANCE VERIFICATION
P
OWER
-U
P
T
EST
Position the aircraft outside of the hangar with no overhead obstructions. With all
other aircraft systems powered down, apply aircraft power to the D1000C Modem
Unit.
1. As soon as power is provided to the unit, observe the LED’s. As startup
routine will light the LED’s on the front of the unit, one by one (from Power to
GPS to Iridium to Msg). This indicates that the software on the unit is
operational.
2. Allow a couple of minutes to acquire both Iridium and GPS signal. The
respective LED’s will light upon sufficient signal. An amber signal indicates
sufficient, but not full signal. Green indicates full signal.
3. Please refer to the “D1000 User Guide” and the “SkyRouter User Guide” for
more operation information.
Please refer to
www.blueskynetwork.com
for FAQs and support information.
UNCONTROLLED COPY IF PRINTED
Содержание D1000C
Страница 15: ...May 2007 Blue Sky Network 100236 D1000C IRIDIUM SATCOM DATA SOLUTION Page 9 UNCONTROLLED COPY IF PRINTED ...
Страница 17: ...May 2007 Blue Sky Network 100236 D1000C IRIDIUM SATCOM DATA SOLUTION Page 11 UNCONTROLLED COPY IF PRINTED ...
Страница 19: ...May 2007 Blue Sky Network 100236 D1000C IRIDIUM SATCOM DATA SOLUTION Page 13 UNCONTROLLED COPY IF PRINTED ...
Страница 31: ...May 2007 Blue Sky Network 100236 D1000C IRIDIUM SATCOM DATA SOLUTION Page 25 UNCONTROLLED COPY IF PRINTED ...