2
1 866 907 0122 blubathworks.com
2013-07
®
Installation Notes
Important! Install this product according to the installation guide. Product does have an overflow. Spout must provide a
minimum of 5” reach for adequate clearance into basin. Our products must be installed by certified professionals only
and according to our installation guide as well as federal, provincial / state and local building codes and regulations.
Installation Preparation
– Provide proper reinforcement, such as a brace, between the studs of the wall to help support the lavatory.
– Install the brace at the proper height, which corresponds to the bracket and lavatory mounting hole locations.
– Brace material must be of a material that cannot be crushed during installation of fasteners.
– For best results, the floor must be level and the wall must be square with the floor.
Installation for Wall-Hung Basins
LAVATORY INSTALLATION
1. Refer to the fixture and measure mounting hole location for accuracy.
2. Use a pencil to mark the location of the fixture mounting holes onto the mounting wall.
3. Measure and install recommended blocking to support vertical load. Ensure blocking member is secured into blocking
or solid wall structure. (Refer to diagram 2 for location.)
4. Lift and place the lavatory on to the wall and brace adequately so that the lavatory can not tip over.
Stud
Reinforcement brace – to width or greater of basin
Existing Wall
Recommend ½"- ¾" plywood
sheathing behind basin
1
2
Bowl
Recommended blocking
to support vertical load
+/- 2"- 4"