INSTALLATION INSTRUCTIONS

GENERAL

The electric boiler is designed to ASME Code and approved as a steam heating boiler
restricted to operation at pressure not to exceed 15 psi.  Boilers are electrically rated as
shown on page 4.  Boiler may have optional CSD1 controls.

UNPACKING

Immediately after unpacking, check for possible shipping damage.  If the appliance is
found to be damaged, save the packaging material and contact the carrier within 15
days of delivery.  Before installing, verify the electrical rating agrees with the
specification on the rating plate.

LOCATION

Position the boiler in its installation location.  Check that there are sufficient clearances
to service the controls, door swing, etc.  Also adequate clearance must be left for making
the required supply and drain connections.

Allow enough space between any other piece of equipment or wall for service access.
Service to the controls may be required on the left and/or right side panels of the
cabinet.

INSTALLATION CODES AND STANDARDS

The boiler must be installed in accordance with:

In Canada:

Provincial and local codes, or in the absence of local codes, with the Canadian Electric
Code, CSA C22.1 (latest edition).  Copies may be obtained from the Canadian
Standards Association, 178 Rexdale Blvd., Etobicoke, Ontario, Canada, M9W 1R3.

In the U.S.A.:

State and local codes, or in the absence of local codes, with the National Electrical
Code, ANSI/NFPA-70 (latest edition).  Copies may be obtained from The National Fire
Protection Association, Batterymarch Park, Quincy, MA, 02269.

Содержание CB24-24E

Страница 1: ...TRIC STEAM BOILER CABINETS INSTALLATION OPERATION MAINTENANCE BLODGETT OVEN COMPANY www blodgett com 44 Lakeside Avenue Burlington Vermont 05401 USA Telephone 800 331 5842 802 860 3700 Fax 802 864 0183 S00045 Rev A 5 04 ...

Страница 2: ...ARNING Improper installation operation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing operating or servicing this equipment CAUTION Operating testing and servicing should only be performed by qualified personnel WARNING Disconnect the power supply to the appliance befor...

Страница 3: ... TABLE OF CONTENTS DESCRIPTION PAGE 1 0 Service Connections 4 2 0 Installation Instructions 5 3 0 Operating Instructions 8 4 0 CSD 1 Optional Feature 10 5 0 Periodic Maintenance 11 6 0 Troubleshooting 14 ...

Страница 4: ... 220V 109 1 94 5 240V AMPS PER LINE 100 0 86 6 480V 58 4 63 8 415V 54 7 N A 380V N A 50 1 50 5 N A 43 3 69 128 107 OUTPUT MAX LBS HR 24 42 36 kW 3 148 48 N A N A 115 5 72 9 66 8 57 7 3 69 66 6 62 9 57 7 36 5 33 4 28 9 WATER QUALITY STATEMENT Water quality is the major factor affecting the performance of your appliance If you are unsure of water quality consult a local water treatment specialist an...

Страница 5: ...s to service the controls door swing etc Also adequate clearance must be left for making the required supply and drain connections Allow enough space between any other piece of equipment or wall for service access Service to the controls may be required on the left and or right side panels of the cabinet INSTALLATION CODES AND STANDARDS The boiler must be installed in accordance with In Canada Pro...

Страница 6: ...arpenter s level on top of appliance and re level side to side and front to back 7 Bolt and anchor appliance securely to the floor 8 Seal bolts and flanged feet with silastic or equivalent compound ELECTRICAL CONNECTIONS WARNING Electrical and grounding connections must comply with the applicable portions of the National Electrical Code and or other local electrical codes WARNING Disconnect electr...

Страница 7: ...ply Connection The incoming cold water supply connection at the rear of the boiler cabinet requires 3 8 tubing and water pressure of 25 50 psig A manual shut off valve must be provided convenient to the boiler this valve should be open when the boiler is in operation Drain Connection The boiler drain 2 IPS should be piped to a floor drain near the boiler There should be no solid drain connection a...

Страница 8: ...ge 4 Water Level Control While boiler is ON briefly open the water level control valve once a day to remove any sediment that might accumulate See page 11 for detailed instructions Safety Valve This valve will release pop off if the boiler has too much pressure Once a week this valve should be tripped during operation to make sure it functions properly OPERATION OF THE BOILER Turn on water and pow...

Страница 9: ... control will stop the flow of water to the boiler As water is consumed in the production of steam the level control will supply additional water to the boiler Firing Cycle The elements are operated by pressure sensing devices On initial operation the boiler should reach 14 psi in approximately 15 minutes At this point the operating pressure switch will open de energizing the elements Thereafter t...

Страница 10: ... is installed on the boiler Should the pressure exceed the limit of this device the boiler will be shut down and put into a state of lockout The PRESSURE pilot light red and the STANDBY pilot light amber will come on Should this device fail to operate the safety relief valve will open Low Water Condition A second low water safety cut off is supplied with the boiler Should the water level fall belo...

Страница 11: ... control Control must be flushed at least once a day CAUTION Protect yourself When flushing control hot water and steam will flow out of the drain When flushing control note water level in gauge glass allow the boiler to fill if necessary and also to come up to temperature Before flushing control note that water level in gauge glass is within operating range and the boiler pressure is at least 6 p...

Страница 12: ...boiler empty close manual blowdown valve If appliance is equipped with Automatic Blowdown turn water supply to appliance OFF Turn power switch ON This will energize and close blowdown valve 2 Remove 3 4 pipe plug from fitting on left front of boiler 3 Insert appropriate hose or tube through fitting and pour in half gallon U S of CLR Descaling Solution If available use the Optional Deliming assembl...

Страница 13: ...down valve does not drain 1 Defective blowdown valve 2 Heat exchanger build up of scalant clogging drain lines and valve Boiler achieves pressure slower than normal 1 Heavy build up of lime on elements 2 Loose element connections Safety valve blows 1 Defective safety valve 2 Pressure too high pressure switch requires adjustment lower or may be defective At least twice a year have an authorized ser...

Отзывы: