MANUAL DE MANUTENÇÃO
PRO 30
29
02
Change Full Head
02.1
Remove tube and off chips
Attention
: Perform this procedure with the machine off.
2.1.1. Remove the filament tube.
(See page 33, task 3.2 and 3.3 to Remove the tube)
2.1.2. Disconnect the 4 plugs marked in the figure below. (hotend, thermistor and fans).
2.2.1. Using a
1.8mm
hexagon key remove the two (2) screws securing the cover.
02.2
Remove cap screws
If the machine is loaded with filament , before starting the Head Change procedure, per-
form task
3.1
(Unload filaments).
(See page 32, task 3.1 Unload filament)
Содержание PRO 30
Страница 1: ...MANUAL DE MANUTENÇÃO PRO 30 ...
Страница 2: ...Português English Español 05 21 25 41 45 61 ...
Страница 3: ......
Страница 4: ......
Страница 22: ...Português English Español 05 21 25 41 45 61 ...
Страница 23: ......
Страница 24: ......
Страница 42: ...Português English Español 05 21 25 41 45 61 ...
Страница 43: ......
Страница 44: ......
Страница 62: ...www blockstec com ...