
3
TIGHTEN ALL BOLT ASSEMBLIES TO THE SPECIFIED TORQUE.
ENSURE UPRIGHTS ARE PLUMB AND ALL SINGLE BARS ARE LEVEL.
DRILL AND SECURE UPRIGHTS AS SHOWN IN 4 STEP FLOOR MOUNTING GUIDE BELOW.
#MADEINBELFAST
VACUUM
DRILL HOLE
90MM
1.
DRILL 10MM HOLE, 90MM DEEP USING PLATE AS A GUIDE.
2.
VACUUM OUT THE DUST.
FLOOR MOUNTING
HAMMER IN
BOLT
TIGHTEN
3.
HAMMER SLEEVE ANCHOR INTO THE HOLE.
4.
TIGHTEN SLEEVE ANCHOR TO SPECIFIED TORQUE
USING13MM SPANNER.
30
Nm
xx
Nm
30
10.0031
10.0019