Tower LTE Owner’s Manual V5
© Blichmann Engineering, LLC 2019
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
2
The Tower LTE Modular Brewing Control Stand is packaged unassembled to allow for more economical shipping. A list
of components included with your Tower LTE follows as well as the basic tools required for assembly. Please carefully
review the lists below to ensure you received all of the correct parts and have the required tools prior to assembly.
Base
BE-000284-00
Lower Support
BE-000286-00
Upper Support
BE-000286-00
Controller Mounting Plate
BE-000287-00
1/4”-20 x 1/2” Bolt Stainless Steel
#10-24 x 3/8” Pan Head Screws
Stainless Steel
1/4”-20 x 1/2” Nut Stainless Steel
SparkBox™ Mounting Kit with
mounting hardware
PARTS LIST:
Item / Part Number
Quantity Item / Part Number
Quantity
1
1
1
1
1
8
2
1
Temperature Sensor Fitting
BE-000268-00
1/4”-20 Screw with Knob
BE-000379-00
1/4”-20 Acorn Nuts Stainless
Steel
Rubber Foot
BE-000376-00
#10-24 Acorn Nuts Stainless
Steel
RipTide™ Pump
Mounting Plate Bracket
1
1
7
4
4
1
1
REQUIRED TOOLS:
7/16” Wrench x2
3/8” Wrench
PTFE Thread Seal Tape
#2 Phillips Screwdriver
Adjustable Wrench
*RipTide™ Pump include with aTOP_Tower_LTE_P models only.
ASSEMBLY: