Blaze B100 Скачать руководство пользователя страница 2

 

 

 

 

 

1.0 

IMPORTANT INFORMATION …………………….....   2 

2.0 

ASSEMBLING THE HEATER .…………………………..   3 

3.0 

INSTALLING THE HEATER ……………………………..   3 

4.0 

REDUCING CLEARANCES TO COMBUSTIBLES …   4 

5.0 

INSTALLING THE FLUE …………………………………..   5 

6.0 

INSTALLING THE BAFFLE PLATE …………………….   6 

7.0 

INSTALLING THE FIREBRICKS ………………………..   6 

8.0 

TECHNICAL DRAWINGS ………………………………..   7 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Most building regulatory Authorities in Australia require any 
wood heater installation to comply with Installation Standard 
AS/NZS 2918:2001. Different states and councils may have 
varying regulations. Check local building regulations before 
installing the appliance. 

All Blaze wood heaters have been tested to ensure that they 
will meet the appropriate safety Standard requirements if the 
instructions in this manual are followed. As the safety and 
emissions performance can be affected by altering the 
appliance, no modifications are allowed without written 
permission from the manufacturer. 

WE RECOMMEND THAT THE INSTALLATION OF YOUR BLAZE 
WOOD HEATER BE CARRIED OUT BY A QUALIFIED INSTALLER. 

WARNING: THE APPLIANCE AND FLUE SYSTEM SHALL BE 
INSTALLED IN ACCORDANCE WITH AS/NZS 2918:2001 AND 
THE APPROPRIATE REQUIREMENTS OF THE RELEVANT 
BUILDING CODE OR CODES. 

WARNING: APPLIANCES INSTALLED IN ACCORDANCE WITH 
THIS STANDARD SHALL COMPLY WITH THE REQUIREMENTS 
OF AS/NZS 4012 & AS/NZS 4013 WHERE REQUIRED BY THE 
REGULATORY AUTHORITY, I.E. THE APPLIANCE SHALL BE 
IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING 
‘TESTED TO AS/NZS 4012 & AS/NZS 4013’. 

ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN 
APPROVED IN WRITING BY THE TESTING AUTHORITY IS 
CONSIDERED TO BE IN BREACH OF THE APPROVAL GRANTED 
FOR COMPLIANCE WITH AS/NZS 4012 & AS/NZS 4013. 

CAUTION: MIXING OF APPLIANCE OR FLUE-SYSTEM 
COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING 
THE DIMENSIONAL SPECIFICATION OF COMPONENTS MAY 
RESULT IN HAZARDOUS CONDITIONS. WHERE SUCH ACTION IS 
CONSIDERED, THE MANUFACTURER SHOULD BE CONSULTED 
IN THE FIRST INSTANCE. 

CAUTION: CRACKED AND BROKEN COMPONENTS, EG. GLASS 
PANELS OR CERAMIC TILES, MAY RENDER THE INSTALLATION 
UNSAFE. 

1. IMPORTANT INFORMATION 

THE INSTALLATION INSTRUCTIONS IN THIS 

MANUAL APPLY TO THE BLAZE B100. 

THEY HAVE BEEN TESTED FOR EMISSIONS AND EFFICIENCY 

AND COMPLY ACCORDING TO AS/NZS 4012:2014 & AS/NZS 

4013:2014. 

TABLE OF CONTENTS 

Содержание B100

Страница 1: ...Installation Instructions Contemporary and Stylish Pecan Engineering Pty Limited proudly supports the activities of Landcare Australia through its membership of the AHHA B100 ...

Страница 2: ...E INSTALLED IN ACCORDANCE WITH AS NZS 2918 2001 AND THE APPROPRIATE REQUIREMENTS OF THE RELEVANT BUILDING CODE OR CODES WARNING APPLIANCES INSTALLED IN ACCORDANCE WITH THIS STANDARD SHALL COMPLY WITH THE REQUIREMENTS OF AS NZS 4012 AS NZS 4013 WHERE REQUIRED BY THE REGULATORY AUTHORITY I E THE APPLIANCE SHALL BE IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING TESTED TO AS NZS 4012 AS NZS 4013 ...

Страница 3: ...rating Instructions for details 3 1 Positioning the Heater First review the necessary minimum clearances specified below before considering where to position the heater These clearances can be greater if desired Also check the practicability of installing the flue system in relation to any obstructing roof beams before positioning the heater These clearance distances can only be reduced if the sur...

Страница 4: ...ated requirements in Section 3 of this Installation Guide it must be done in accordance with Australian Standard AS NZS 2918 2001 Section 3 Tables 3 1 3 2 Shield Construction The shield shall be constructed from a heat resistant material The shield must be fixed to the surface that requires protection and NOT the heater The Standard allows three options to reduce stated clearances Single layer of ...

Страница 5: ...cro mesh The manufacturer s decro mesh locating ring must be used to support the decro mesh and inner shield up off the heater top It is important that air can be drawn into the base and rear of the decro mesh Place the locating ring above the flue spigot resting on the top plate and then place the first length of 150mm active flue into the spigot With the 490mm inner shield fitted inside the decr...

Страница 6: ...ing it forward enough to clear the rear support rods 4 Once clear of the rear support rods push the baffle back so that it is resting hard up against the rear of the firebox 5 Centralise the baffle so that gaps between each side and firebox are equal 1 Place lower brick retainers in base of firebox centralised and against rear of the firebox 2 Place three bricks along the back 3 Place two medium s...

Страница 7: ...7 Pecan Engineering Pty Limited 13 Acorn Road Dry Creek South Australia 5094 T 08 8349 8332 F 08 8260 6643 Email info pecan eng com au 12 TECHNICAL DRAWINGS ...

Отзывы: