Installation Instructions
Contemporary and Stylish
Pecan Engineering Pty Limited proudly supports the activities of Landcare Australia through its membership of the AHHA
B100
Страница 1: ...Installation Instructions Contemporary and Stylish Pecan Engineering Pty Limited proudly supports the activities of Landcare Australia through its membership of the AHHA B100 ...
Страница 2: ...E INSTALLED IN ACCORDANCE WITH AS NZS 2918 2001 AND THE APPROPRIATE REQUIREMENTS OF THE RELEVANT BUILDING CODE OR CODES WARNING APPLIANCES INSTALLED IN ACCORDANCE WITH THIS STANDARD SHALL COMPLY WITH THE REQUIREMENTS OF AS NZS 4012 AS NZS 4013 WHERE REQUIRED BY THE REGULATORY AUTHORITY I E THE APPLIANCE SHALL BE IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING TESTED TO AS NZS 4012 AS NZS 4013 ...
Страница 3: ...rating Instructions for details 3 1 Positioning the Heater First review the necessary minimum clearances specified below before considering where to position the heater These clearances can be greater if desired Also check the practicability of installing the flue system in relation to any obstructing roof beams before positioning the heater These clearance distances can only be reduced if the sur...
Страница 4: ...ated requirements in Section 3 of this Installation Guide it must be done in accordance with Australian Standard AS NZS 2918 2001 Section 3 Tables 3 1 3 2 Shield Construction The shield shall be constructed from a heat resistant material The shield must be fixed to the surface that requires protection and NOT the heater The Standard allows three options to reduce stated clearances Single layer of ...
Страница 5: ...cro mesh The manufacturer s decro mesh locating ring must be used to support the decro mesh and inner shield up off the heater top It is important that air can be drawn into the base and rear of the decro mesh Place the locating ring above the flue spigot resting on the top plate and then place the first length of 150mm active flue into the spigot With the 490mm inner shield fitted inside the decr...
Страница 6: ...ing it forward enough to clear the rear support rods 4 Once clear of the rear support rods push the baffle back so that it is resting hard up against the rear of the firebox 5 Centralise the baffle so that gaps between each side and firebox are equal 1 Place lower brick retainers in base of firebox centralised and against rear of the firebox 2 Place three bricks along the back 3 Place two medium s...
Страница 7: ...7 Pecan Engineering Pty Limited 13 Acorn Road Dry Creek South Australia 5094 T 08 8349 8332 F 08 8260 6643 Email info pecan eng com au 12 TECHNICAL DRAWINGS ...