OM-PI1010A E V1.10
May 21, 2015
Page 16
PI1010A
INSTALLATION INSTRUCTIONS cont.
4. Slide the unit into the fi replace opening and
attach the chimney liner or fl ue connector
system as required. Work through the opening
above the unit where the top shroud panel will
fi t. If access to the fl ue outlet on the insert is
restricted by fi replace opening height you may
need to temporarily remove a side panel (as
fi tted in step 2) to allow enough work area to
properly connect the insulated stainless steel
fl ue liner. Depending upon the particular
installation the unit may need to be pulled out
slightly away from the front of the fi replace.
In some installations the leveling bolts might
make it diffi
cult to slide the unit into a fi replace
with a rough hearth. We have provided two
metal strips approximately 3” x 16” to help with
this problem. Lay the strips down and slide the
unit on them. Th
is may not be required in all
circumstances. If they are not required discard
the strips.
5. Assemble the shroud trim as shown in
Fig. 3
. It
will be attached to the unit during the next step.
6. Place the shroud top onto unit sliding it down so
the tabs on the back of the shroud top slide over
the tabs fl ange on the insert. (see
Fig. 4
)
Left
L-Brac kets X2
Top
Right
Brass Scre ws X4
Screw
Screw
Figure 4