THE CALDERA
Page 22
Through Roof Framing
Maintain 10” opening relative to the pitch of
the roof.
10” square
Use a suitable round or square support
through the roof. Ensure adequate heat
shield protection is provided.
Termination Above Roof
Consult local codes for minimum vent cap
height above the roof, vent must be a
minimum 2’ from any wall.
To
prevent
water
seepage
install
the
flashing with upper portion slid under the
roofing material and the lower portion over
the roofing material.
Note: Do not fasten down until the final
adjustments to the vent have been
made.
INSTALLATION INSTRUCTIONS
Cont...
Содержание CALDERA
Страница 6: ...THE CALDERA Page 6 APPLIANCE DIMENSIONS Figure 1 ...
Страница 28: ...THE CALDERA Page 28 INTERMITTENT PILOT VALVE cont d Optional Wall thermostat interrupt green wire ...
Страница 32: ...THE CALDERA Page 32 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions Fig 3 Receiver body ...
Страница 33: ...THE CALDERA Page 33 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 34: ...THE CALDERA Page 34 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 35: ...THE CALDERA Page 35 HANDHELD THERMOSTAT REMOTE CONTROL operation instructions ...
Страница 43: ...THE CALDERA Page 43 FUEL CONVERSION ...
Страница 49: ...THE CALDERA Page 49 FAN KIT INSTALLATION continued Figure 24 ...
Страница 51: ...THE CALDERA Page 51 Replacement Parts list for Caldera 1 ...
Страница 53: ...THE CALDERA Page 53 NOTES SERVICE HISTORY DATE CORRECTIVE ACTION INCLUDE REPLACEMENT PARTS ...