EN
1
18
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob.
• Place bracket
7.2.1
on the wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket
7.2.1
on the wall as shown at X mm below the first bracket (X = height of the
upper chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 320 mm
above the horizontal reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs
11
in the holes.
• Fix the lower bracket
7.2.1
using the
12a
screws (4,2 x 44,4) supplied.
• Fix the upper bracket
7.2.1
and the air outlet connection support
7.3
together using the 2
screws
12a
(4,2 x 44,4) supplied.
• Fix the Hood Body Fixing Brackets
7.1
using the 2 screws
12a
(4,2 x 44,4) and Washers
22
supplied, checking levelling.