MUI_BUSA142EN-03
www.blauberg.us
174 N. 36th Street, Lafayette, IN 47905
e-mail: [email protected]
The drain pan in the heat recovery section is equipped with a drain pipe for condensate removal.
Connect the pipe, the U-trap or U-trap of the other type (hydraulic lock) that is not included in the delivery set and a sewage system with metal, plastic or rubber connecting hoses.
Install the hoses with the minimum slope 3°.
Before starting operation of the unit make sure that the water flows freely into the sewage collection system, otherwise condensed water may build up in the unit during heat recovery,
which , in turn, may cause equipment failure and water ingress into the premises. Fill up the U-trap with water before using it. When using other U-trap systems read the installation
instruction to prepare the condensate drain system for operation.
For the units with a drain pump make sure that the flexible hose from the pump must is connected to the sewage system.
The drain pump provides timely pumping of the condensed water from the unit.
to sewage system
mounting oF humidity SenSor (not included in the delivery Set)
The humidity sensor must be attached inside of the return air duct.
Open the unit, take off the upper part of the protecting housing and attach the humidity sensor to the holder located on the return air duct wall. Connect the humidity sensor
sockets to a respective plug on the control unit.
Update the control configuration after connection of the humidity sensor. Contact the product Seller for doing that.
1
2
3
1
2
3
Holder
Humidity sensor
Socket for
connection
to the humidity
sensor
Plug for
connection
to the controller