20
www.blaubergventilatoren.de
EKH
DISCONNECT THE UNIT FROM POWER MAINS PRIOR
TO ANY MAINTENANCE OPERATIONS WITH THE UNIT.
The heaters shall be operated and maintained by duly qualified experts.
Check the following conditions during the unit maintenance:
•
Inspection of screw connections as well as rivet and welded joints;
•
Inspection of tightening of ground screw clamps and electric connections;
•
Inspection of the wire terminal connections;
•
Cleaning of the electric heating elements of dust and dirt. Cleaning with any kinds of solvents and/or flammable substances is forbidden.
Store the unit in the manufacturer’s original packing box in a dry ventilated premise at ambient temperatures from +10 °C up to + 40 °C and at relative
humidity max. 80 %.
The unit can be transported in the original packing by any mode of transport without limitation provided proper protection against precipitation and
mechanical damage.
Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
Follow the handling requirements applicable for the particular type of cargo.
Avoid sharp blows, scratches or rough handling during loading and unloading.
Do not expose the unit to sudden changes in temperature. Such changes can lead to condensation of moisture inside the unit and performance
disturbance when the unit is switched on. Prior to the initial power-up after transportation at subzero temperatures allow the unit to warm up at room
temperature for at least 2 hours.
TECHNICAL MAINTENANCE
STORAGE AND TRANSPORTATION REGULATIONS
Содержание EKH 100-0.6
Страница 1: ...DUCT HEATER OPERATION MANUAL EKH EN...
Страница 23: ...www blaubergventilatoren de 23 EKH...
Страница 24: ...www blaubergventilatoren de B09EN 09...