8
4. Initial Operation
Before using the machine it is essential to inspect the machine every day.
It is not permitted to use the machine if it does not pass all of the checkpoints below.
Checkpoints of Machine Safety:
▪
Shifter should be in the neutral position.
▪
All hydraulic hose connections are tightened and there is no leakage of oil.
▪
The safety functions and operating functions work correctly.
▪
There are not any loose nuts or bolts.
Содержание BMR-75D
Страница 1: ...OPERATING MANUAL BMR 75D VERSION 1 0 www blastrac com 1 800 256 3440...
Страница 22: ...22 Roll the Blasthead away from the BMR 75...
Страница 25: ...25 Attaching the Scarifier Repostion the tensioner for the blast head to the front hole for the scarifier head...
Страница 28: ...28 Roll the Scarifier head up to the BMR 75...