Page 27
877-877-2269 | blackbox.com
Chapter 3: Assembly Instructions
STEP 5: Assembly is complete.
Figure 3-15. RM220A assembly, Step 5.
STEP 6: Use the included (25) M6 cage nuts (not shown in Figure 3-11) and (25) M6 x 12-mm pan-head machine screws (also not
shown in Figure 3-11) for mounting equipment.
The Mobile Open Rack requires no further installation. Just slide it under your sitting-height or standing-height desk and roll the
rack out when you need to access IT, test, diagnostic, and other electrical equipment stored on the rack. Its swiveling, locking
casters make the rack easy to move and secure as needed.
Содержание RM210A
Страница 35: ...Page 35 877 877 2269 blackbox com NOTES ...