
7
INSTALLATION PROCEDURE
1. Mounting holes are designed for 3/8" hardware, 16" on center.
2. Use the template on the shipping box to locate your mounting holes.
3. To adjust mounting rails, use 7/16 socket or wrench to loosen ¼-20 carriage bolts and nuts (multiple locations on the
rail, dependent upon height); slide rail to desired location and tighten hardware.
A
FRONT VIEW
(without Door)
19.17
21.25
18.31 TO
H
E
IG
H
T
10.63
1
2
.0
0
R
M
U
18.31 C-to-C
FRONT VIEW WITHOUT DOOR
FRONT VIEW WITH DOOR
21.25
19.17
V
ARIES
10.63
Use latch supplied in hardware bag,
when horseshoe knockout is used
Rear section
1", 2" and 3" nominal
concentric conduit
knockouts and horseshoe
knockouts; top and bottom rear
section
Continuous Hinges on front
door and rear section
Front door
Provision for optional 2 fan assembly
Center swing section
19" EIA mounting rails;
2 pairs of M6 rails
Independent
locking front door
and rear section
1.877.877.2269
Blackbox.com
INSTALLATION
N E E D H E LP?
LE AVE TH E TECH TO US
LIVE 24/7
TECHNICAL
SUPPORT
1.877.877.2269