background image

724-746-5500   |   blackbox.com 

Page 4

 

Preface

Preface

This manual is provided to prevent service personnel from committing an act that results in the risk of fire, electric shock, or injury 
to persons. Only trained service personnel should receive, unpack, and assemble the Small Office/Home Office (SOHO) Cabinet.  
In addition, only trained service personnel should install equipment in enclosures.

Safety Symbols Used in this Manual

This manual provides general safety guidelines to be observed during installation, operation, and maintenance of the SOHO 
Cabinet.

WARNING: Failure to follow directions in the warning could result in injury to persons or loss of life.

CAUTION: Failure to follow directions in the caution could result in damage to equipment or storage data.

Safety Considerations

WARNING:  Improper handling and use of the SOHO Cabinet could result in equipment damage, serious injury, or possible death.

Only trained service personnel should be used to remove the enclosure from the pallet. Also, be sure you have a sufficient number 
of service personnel. Do not attempt to move enclosures by yourself.

Only UL

®

 Listed ITE units should be installed inside the SOHO cabinet.

Be sure to read and follow all individual manufacturer equipment manuals for safety and installation instructions.

The SOHO Cabinet was not evaluated as a fire enclosure.

Proper spacing is required when installing electrical equipment to avoid electrical shock. Maintain minimum spacing between  
the accessories and components and the computer enclosure assembly for safe operation of the equipment when installed  
in accordance with the National Electric Code ANSI/NFPA 70-1999.

The ambient temperature operating range for the SOHO enclosure and accessories is +50 to +95° F (+10 to +35° C).

The non-operating temperature is -4 to +140° F (-20 to +60° C).

Содержание RM140A-M-R2

Страница 1: ...Home Office SOHO Cabinets Order toll free in the U S Call 877 877 BBOX outside U S call 724 746 5500 FREE technical support 24 hours a day 7 days a week Call 724 746 5500 or fax 724 746 0746 Mailing a...

Страница 2: ...mbH Co UL is a registered trademark of Underwriters Laboratories Any other trademarks mentioned in this manual are acknowledged to be the property of the trademark owners We re here to help If you hav...

Страница 3: ...ing Unpacking and Removing the SOHO Cabinet from the Pallet 10 3 2 Loading Equipment 10 3 3 Power 10 3 4 Protective Grounding 11 3 4 1 Connecting the Main Protective Grounding Stud to the Dedicated Br...

Страница 4: ...ling and use of the SOHO Cabinet could result in equipment damage serious injury or possible death Only trained service personnel should be used to remove the enclosure from the pallet Also be sure yo...

Страница 5: ...8 cm RM145A R2 RM145A M R2 37 5 95 3 cm Exterior Height 24 8 63 cm Exterior Height with Casters 25 8 65 5 cm Finish Black powder coat Grounding Studs located on the doors and side panels Interior Dep...

Страница 6: ...Office Home Office SOHO Cabinets arrive fully assembled and fit neatly on the floor under a desk Their dimensions are shown in Figures 1 1 through 1 3 23 990 60 93 cm Figure 1 1 Top view of cabinet 25...

Страница 7: ...Specifications RM140A R2 RM140A M R2 23 990 61 cm RM145A R2 RM145A M R2 35 990 91 4 cm Figure 1 3 Side view of cabinet To adjust the rails use an 7 16 mm socket as shown in Figure 1 4 Figure 1 4 Adju...

Страница 8: ...ar doors Clear PLEXIGLAS front door or mesh front door Rear door provides mounting locations for two 4 10 2 cm fans see Table 2 1 Cable access below the rear door Solid top and sides Open base Fits un...

Страница 9: ...ons Construction 16 gauge steel Finish Black powder coat Size Unit 30 5 H x 14 9 W x 0 5 D 77 5 x 37 8 x 1 3 cm Shipping 39 5 H x 18 W x 1 D 100 3 x 45 7 x 2 5 cm Weight Shipping 8 5 lb 3 8 kg 2 4 3 S...

Страница 10: ...excessive force obstructed routes and uneven floor surfaces may cause the enclosure to topple over 3 2 Loading Equipment WARNING Only install equipment after the SOHO cabinet has been properly secured...

Страница 11: ...otective Grounding Stud to the Protective Bonding Conductors Connect the rear doors to the main protective grounding studs inside at the bottom and top rear of the enclosure chassis using a listed rin...

Страница 12: ...724 746 5500 blackbox com Page 12 Chapter 3 Installation Brush grommet on each end of plate seals out air and dust Figure 3 1 Brush grommets on plate...

Страница 13: ...ng glide to the proper height using a 3 4 open ended wrench 4 2 Removing the Doors The front and rear locking doors are removable To remove a door open the door beyond 90 degrees Then grasp the door w...

Страница 14: ...ge 14 Chapter 5 Service 5 Service The SOHO Cabinet should be repaired by personnel trained by Black Box or returned to Black Box for repair or replacement Contact Black Box Technical Support at 724 74...

Страница 15: ...Page 15 NOTES...

Страница 16: ...cabinets and racks and power and surge protection products to media converters and Ethernet switches all supported by free live 24 7 Tech support available in 30 seconds or less Copyright 2011 All ri...

Отзывы: