CHAPTER 4: Operation
23
Should the A/S-2G receive a DLE EOT (disconnect), the A/S-2G will cycle the synchro-nous DTR lead
off for 2 seconds. This action will disconnect a phone line if the DTR B jumper is set for CNT.
NOTE
The A/S-2G will cycle the synchronous DTR lead off for 2 seconds whether the DLE EOT sequence comes from
the synchronous or asynchronous side.
EBCDIC
CHARACTERS STRIPPED
Character
Hex
Character
Hex
NUL
00
ACK
2E
SOH
01
DLE
10
STX
02
NAK
3D
ETX
03
SYN
32
EOT
37
ETB
26
ENQ
2D
Table 4-4. EBCDIC characters stripped.