![Black Box LPH3100A Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/black-box/lph3100a/lph3100a_quick-start-manual_2764123004.webp)
STEP 2 -
Connect the Power
POWER CONNECTION STEPS
The LPH3100A switch supports dual +12 to
24 VDC power inputs and changes relay status
when the power fails.
1. Insert the positive and negative wires
into the V+ and V- contacts on the terminal
block connector.
2. Tighten the wire clamp screws to prevent
the DC wires from loosening.
3. Link a closed-loop device (such as an alarm
system) to P-Fail for transmit signals only,
+
+
_
_
+ _
_
+ _
PWR2 1A @ 24V PWR1
V2- V2+
V1- V1+
P-Fail
Single DC Power
Redundant DC Power
Chassis
GND
Chassis
GND
One DC Supply
Dual DC Supplies
Connection to
Grounding Point
Drain Wire
with Lug