724-746-5500 | blackbox.com
Page 14
Chapter 4: Installing the Switch
Figure 4-2. SFP transceiver.
4.3 Equipment Checklist
After unpacking this switch, please check the contents to be sure you have received all the components (listed below and in
Section 2.2). Then, before beginning the installation, be sure you have all other necessary installation equipment.
• Gigabit SFP Managed Switch Eco
• (4) adhesive rubber feet
• Mounting accessory for 19" rack shelf
• (1) RS-232 DB9-to-DB9 cable
• (1) AC power cord
To download the user manual,
visit www.blackbox.com and enter LGB5128A in the search bar, then download the user’s manual,
or download the user’s manual from ftp://ftp.blackbox.com/anonymous/manuals/L/LGB5128A_USER_rev1.pdf.
WARNING: The SFP/SFP+ modules are Class 1 laser devices. Avoid direct eye exposure to the beam coming from the transmit
port.
4.4 Mounting
The switch can be mounted in a standard 19-inch equipment rack or on a desktop or shelf. Mounting instructions for each type
of site follows.
4.4.1 Rackmounting
Before rackmounting the switch, please pay attention to the following factors:
• Temperature: Since the temperature within a rack assembly may be higher than the ambient room temperature, check that the
rack environment temperature is within the specified operating temperature range 32 to 140° F (0 to 60 °C).
• Mechanical Loading: Do not place any equipment on top of a rackmounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not overloaded.
• Grounding: Rackmounted equipment should be properly grounded.
Содержание LGB5128A
Страница 21: ...724 746 5500 blackbox com Page 21 NOTES...
Страница 22: ...724 746 5500 blackbox com Page 22 NOTES...
Страница 23: ...724 746 5500 blackbox com Page 23 NOTES...