background image

7   WATER SUPPLY CONNECTIONS

Connect water Supply Lines (

7A

) to Faucet Inlets (

7B

). 

(Supply lines and 

fi ttings are not included).

8   POP-UP ROD CONNECTION

Insert Lift Rod (

8A

) into hole at the back of Faucet (

8B

). Gently, slide Lift Rod 

(

8A

) down the hole in Faucet (

8B

).

POP-UP DRAIN BODY INSTALLATION STEPS

9   POP-UP PREPARATION

Remove Flange (

9A

) and unscrew Nut (

9C

) from the Pop-Up Drain Body 

(

9B

). Retain the Packing Ring (

9D

) inside the Ball Rod Opening (

9E

). Take 

9E

9E

off the Spring Clip (

9F

) from the Ball Rod (

9G

). Place the Nut (

9C

) over 

the Ball Rod (

9G

). Remove Locknut (

9H

), Friction Washer (

9J

), Rubber 

Washer (

9K

), and Stopper (

9K

9K

9L

) from Flange (

9A

).

10   POP-UP INSTALLATION

Apply a small bead of putty underneath the Flange (

10A

) and place a ring of 

putty around Drain Opening (

10B

) of sink. Use PTFE plumber’s tape to all 

threaded fi ttings according to  manufacturer’s instructions. Insert Flange (

10A

into Drain Opening (

10B

). From underneath, insert Rubber Washer (

10C

) and 

Friction Washer (

10D

) over the bottom of Flange (

10A

). Thread Locknut (

10E

10E

10E

until Rubber Washer (

10C

) seats securely inside Drain Opening (

10B

). Thread  

Drain Body (

10F

) to bottom of Flange (

10F

10F

10A

). Hand tighten and adjust the Drain 

Body so that the Ball Rod Opening (

10G

) faces the rear. Wrench tighten Locknut 

(

10E

) and wipe excess putty.

10E

10E

11   BALLROD ADJUSTMENT

Drop the Stopper (

11A

) into the Drain Body (

11B

) from the top with the Off-Set 

(

11C

) facing rear. From below, insert the Ball Rod (

11D

) into the Ball Rod Opening 

(

11E

) through the Stopper Hole (

11E

11E

11F

) and secure with the Nut (

11F

11F

11G

).

7

8

9

10

11

3

ENGLISH

7A

7B

8A

8B

9C

9A

9B

9D

9E

9F

9G

9K

9H

9A

9L

9B

9G

9J

9C

10F

10E

10D

10C

10A

10A

10B

10G

11F

11D

11A

11B

11C

11D

11E

11G

Содержание Price Pfister 48-N Series

Страница 1: ...ur Lavabo 09 22 04 EO6773C 29163 0200 A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY Copyright 2004 Price Pfister Inc 2004 Price Pfister Inc ...

Страница 2: ...urface thoroughly 3 TOOLS RECOMMENDED PTFE plumber s tape or thread sealant Plumber s putty Slotted screwdriver Phillips head screwdriver Pliers Adjustable wrench Flashlight Cloth Your installation may require supply lines and or shut off valves cone washers friction rings or other additional tools Consult the store where your faucet was purchased for recommended connections that may be required f...

Страница 3: ...r s tape to all threaded fittings according to manufacturer s instructions Insert Flange 10A into Drain Opening 10B From underneath insert Rubber Washer 10C and Friction Washer 10D over the bottom of Flange 10A Thread Locknut 10E 10E 10E until Rubber Washer 10C seats securely inside Drain Opening 10B Thread Drain Body 10F to bottom of Flange 10F to bottom of Flange 10F 10A Hand tighten and adjust t...

Страница 4: ...hot and cold water supplies and check for leaks above and below the sink 14 VALVE FUNCTION COLD valve close counterclockwise open clockwise HOT valve close clockwise open counterclockwise 15 FLUSHING AERATOR CLEANING After installation is complete remove Aerator Housing 15A Turn Valves 15B on and allow both hot and cold water to run for at least one minute each While water is running check for lea...

Страница 5: ...nd Warranty Information CAUTION Maintenance DISASSEMBLY 1 Replacement parts may be available at the store where you purchased your faucet 2 When replacement parts are not available please write or call Price Pfister Consumer Service 3 Always turn off water and relieve pressure before working on your faucet NOTE Trim Care Cleaning Instructions For all handles and decorative finishes use only a soft d...

Страница 6: ...A COMPANY A COMPANY A COMPANY A COMPANY 48 N Series Serie 48 N Série 48 N English English Español Español Letter Designates Finish Letter Designates Finish La Letra Indica el Terminado La Letra Indica el Terminado La Lettre Designe La Fini La Lettre Designe La Fini A J PVD Brushed Nickel PVD Niquel Cepillado PVD Nickel Brosse 910 024 Hot Caliente Chaud 910 025 Cold Frío Froid 941 106 972 019 940 0...

Отзывы: