7 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (
7A
) to Faucet Inlets (
7B
).
(Supply lines and
fi ttings are not included).
8 POP-UP ROD CONNECTION
Insert Lift Rod (
8A
) into hole at the back of Faucet (
8B
). Gently, slide Lift Rod
(
8A
) down the hole in Faucet (
8B
).
POP-UP DRAIN BODY INSTALLATION STEPS
9 POP-UP PREPARATION
Remove Flange (
9A
) and unscrew Nut (
9C
) from the Pop-Up Drain Body
(
9B
). Retain the Packing Ring (
9D
) inside the Ball Rod Opening (
9E
). Take
9E
9E
off the Spring Clip (
9F
) from the Ball Rod (
9G
). Place the Nut (
9C
) over
the Ball Rod (
9G
). Remove Locknut (
9H
), Friction Washer (
9J
), Rubber
Washer (
9K
), and Stopper (
9K
9K
9L
) from Flange (
9A
).
10 POP-UP INSTALLATION
Apply a small bead of putty underneath the Flange (
10A
) and place a ring of
putty around Drain Opening (
10B
) of sink. Use PTFE plumber’s tape to all
threaded fi ttings according to manufacturer’s instructions. Insert Flange (
10A
)
into Drain Opening (
10B
). From underneath, insert Rubber Washer (
10C
) and
Friction Washer (
10D
) over the bottom of Flange (
10A
). Thread Locknut (
10E
)
10E
10E
until Rubber Washer (
10C
) seats securely inside Drain Opening (
10B
). Thread
Drain Body (
10F
) to bottom of Flange (
10F
10F
10A
). Hand tighten and adjust the Drain
Body so that the Ball Rod Opening (
10G
) faces the rear. Wrench tighten Locknut
(
10E
) and wipe excess putty.
10E
10E
11 BALLROD ADJUSTMENT
Drop the Stopper (
11A
) into the Drain Body (
11B
) from the top with the Off-Set
(
11C
) facing rear. From below, insert the Ball Rod (
11D
) into the Ball Rod Opening
(
11E
) through the Stopper Hole (
11E
11E
11F
) and secure with the Nut (
11F
11F
11G
).
7
8
9
10
11
3
ENGLISH
7A
7B
8A
8B
9C
9A
9B
9D
9E
9F
9G
9K
9H
9A
9L
9B
9G
9J
9C
10F
10E
10D
10C
10A
10A
10B
10G
11F
11D
11A
11B
11C
11D
11E
11G