Ventless Hood System
Installation
16
Appliance Electrical Connection
This connection is for appliances requiring a Listed flexible conduit connection (refer to figure below).
1. Remove receptacle and four wires (T1, T2, T3, and Ground).
2. Cover junction box hole with provided plate and hardware removed from receptacle.
3. Remove hole plug from hole in bottom of electrical enclosure and install conduit from appliance
utilizing appropriate Listed fitting (not provided).
4. Wire appliance as shown in figure below and the electrical diagram in this manual.
5. Replace all panels and install cover over hole that was provided for the receptacle (now removed)
Содержание Ventless Hood System FH-28
Страница 1: ...Ventless Hood System MODEL FH 28 Service Manual Serial Numbers 123046 and higher ...
Страница 20: ...Ventless Hood System Replacement Parts 18 Figure 1 Electrical Box Assembly ...
Страница 22: ...Ventless Hood System Replacement Parts 20 Figure 2 Blower Motor Assembly ...
Страница 24: ...Ventless Hood System Replacement Parts 22 Figure 3 Right Side Cabinet Assembly ...
Страница 29: ...Ventless Hood System Wiring Diagrams 27 Wiring Diagrams ...
Страница 30: ...Ventless Hood System Notes 28 Notes ...
Страница 31: ...Ventless Hood System Notes 29 ...
Страница 32: ...P O Box 80400 Simpsonville S C 29680 0400 USA http www bkideas com Made and printed in the U S A LI0191 0908 ...