
START-UP REPORT FORM
START-UP REPORT FORM
This form is designed to record the initial installation, and to serve as a guide for troubleshooting at a
later date (if needed).
BJM Pumps, LLC
123 Spencer Plain Road
Old Saybrook, CT. 06475
Pump Owner’s Name
Location of Installation
Date of Installation:
Dealer
Dealer Phone ( )
Date of Purchase
Model
Serial No
Voltage
Phase
Hertz
HP
Does impeller turn freely by hand?
Yes
No
Condition of Equipment
New
Good
Fair
Poor
Condition of Cable Jacket
New
Good
Fair
Poor
Rotation: Direction of Impeller Rotation (viewed from bottom)
(Use C/W for clockwise, CC/W for counterclockwise):
Resistance of cable and Pump Motor (measured at pump control)
Red-Black
ohms
Red-White
ohms
White-Black
ohms
Resistance of ground circuit between control panel and outside of pumps
Ohms
MEG
OHM CHECK OF INSULATION
Red to ground
White to ground
Black to ground
Condition of location at start-up
Dry
Wet
Muddy
Was equipment stored
If YES, length of storage:
Yes
No.
Liquid being pump
Debris in bottom of station?
Yes
No
Содержание SV1500CF
Страница 10: ...10 Figure 1 SV400F 115 and SV750F 115 control Figure 2 SV750F 230 and SV1500F 230 control ...
Страница 14: ...14 EXPLODED VIEW OF SV400F ...
Страница 15: ...15 EXPLODED VIEW OF SV750CF ...
Страница 16: ...16 EXPLODED VIEW OF SV1500CF ...
Страница 18: ...18 SINGLE PHASE WIRING DIAGRAMS 115V 230V MODELS SV400F ...
Страница 19: ...19 MODELS SV750CF SV1500CF ...
Страница 25: ...NOTES ...