1
Operating instruction EC II
Installation
4 − 13
6.107.98.5.01.44
4.3
Commissioning
The initial installation and commissioning as well as instruction in the operation, cleaning, care
and maintenance will be carried out by the responsible Bizerba Customer Service Agent or
the Bizerba specialist adviser.
4.3.1
Switch device on
Requirement:
− The device was installed properly and connected to the mains.
− The scale should not be loaded.
Fig.: Keyboard
1
ON/OFF key
The scales are switched on and off via the
<ON/OFF> key.
4.4
Decommissioning
If you wish to decommission the scale for a prolonged period of time,
−
Switch the scale off.
−
Disconnect scale from mains (unplug plug power pack).
−
Remove the direct plug−in transformer unit from the bottom of the scale.
−
Remove the batteries or rechargeable batteries from the battery compartment.
−
Clean the scale in accordance with the cleaning instructions.
4
Содержание EC II 100
Страница 4: ...6 107 98 5 01 44...
Страница 8: ...Operating instruction EC II List of contents 0 4 6 107 98 5 01 44...
Страница 12: ...Operating instruction EC II About these instructions 1 4 6 107 98 5 01 44 1...
Страница 20: ...Operating instruction EC II About the device 2 8 6 107 98 5 01 44 2...
Страница 36: ...Operating instruction EC II Installation 4 14 6 107 98 5 01 44 4...
Страница 40: ...Operating instruction EC II Device and operating controls 5 4 6 107 98 5 01 44 5...
Страница 50: ...Operating instruction EC II Operation 6 10 6 107 98 5 01 44 6...
Страница 72: ...Operating instruction EC II Maintenance 9 2 6 107 98 5 01 44 9...
Страница 77: ...Operating instruction EC II Appendix 6 107 98 5 01 44 Appendix Declaration of Conformity...
Страница 78: ...Operating instruction EC II Appendix 6 107 98 5 01 44...
Страница 80: ...6 107 98 5 01 44...
Страница 81: ......