FITTING INSTRUCTIONS
Screwdriver - crosshead
Pliers
Electric drill
Masonry drill bit - 10mm dia
Spirit level
Stepladder (for taller radiators)
A
4
B
4
C
4
D
4
E
1
Wall Plug
Bracket
Screw - Crosshead, 6.3mm dia x 60mm
Grub Screw
Allen Key
Tools & Material Required
Key
Component
Qty
Assembly Instructions
Accurately mark out bracket holes on wall using spirit level.
Drill four 10mm dia holes to a minimum depth of 70mm & insert wall
plugs (A).
Screw brackets (B) into wall plugs (A) with 6.3mm diameter x 60mm
screws (C).
Offer radiator up to wall and slide square posts on the rear of the
radiator into brackets (B).
Secure radiator in position by tightening grub screw (D) with Allen
key (E).
Electric radiators should be fitted only by a qualified electrician and
must be earthed and connected to a cable outlet in the bathroom in
accordance with I.E.E. wiring regulations. The electrical connection
should be made to a ‘5 amp fused fixed spur’ located outside the
bathroom.
Note: for maintenance purposes, cable outlets must remain
accessible and cables must not be buried directly into walls.
Issue 4.1
Electric Gio Towel Radiator
© Bisque, a division of Zehnder Group UK Ltd
E
B
C
A
D