
Special attention: The machine will move forward automaticly while it is spading the ground. The
operator should hold the handle in order to control the speed. To avoid hurting the machine,
spading depth should be not more than 3-5mm
Clockwise circumgyrate the trowel arm to lift the blade shaft away from the ground before you
after use. Than stop the engine.
The blade shaft could be take down by anticlockwise circumgyrate the trowel arm.
Engine Operation
Check the lever before starting the engine. Because of the number of engine options, please refer
to engine owner’s manual for specific instructions regarding engine operation.]
Gearbox Oil Lever
Check the gearbox oil lever daily.
Check the gearbox oil lever level by removing the plug located on the side of the gearbox. It will
be clearly marked by the “check” decal (see Machine Decals section). Take care when removing
plugs on the gearbox, there are two of them. Removal of the bottom of the fill plug hole, located
approximately halfway up the side of the gear box.
Operation
The following steps are intend as a basic guide to machine operation, and are not to be considered
a complete guide to concrete finishing.