Bison ShootOut Combo SC2480IGAFB Скачать руководство пользователя страница 5

6. Insert 

each 

Backstay 

(H) into the welded attachment tubes located on the 

90

° 

Corner 

(C) and the 

Backstay 

Brackets 

(I).  Install and tighten a 

5/16” x 2 3/4” Hex Bolt

 (M) and a 

5/16” Nylon Lock Nut 

(N) at each loca-

tion.  Tighten the 

Backstay Bracket 

(I) hardware.  See Figure 2 and 3. 

 
7. Slide 

the 

Connecting Bar 

(E) into the 

Long Inner Tube

 (G) through  the channel so that at least 2 holes are 

lined up.  Slide the 

Ground Sleeves

 (G) into the bottom of the 

Uprights 

(B).  Install two 

3/8” x 1” Hex Bolts 

(J) on each.  The 

Long Inner Tube 

(G) should be protruding 23 1/2” below the 

Upright 

(B). See Figure 3. 

 
8.  Dig holes a minimum of 8” in diameter and at least 30” deep on the goal line.  It is advisable to bell out the 

bottom of the holes to improve goal stability.  Make sure the goal is centered on the field before digging.  The 
front surface of the goal should be even with the front edge of the goal line when installed.  The distance be-
tween the holes will be determined by the purchased goal size.  The 24’ x 8’ goal requires the holes to be 24’4” 
apart on center, the 21’ x 7’ goal requires the holes to be 21’4” apart on center, the 18 1/2’ x 6 1/2’ goal re-
quires the holes to be 18’10” apart on center, the 12’ x 6 1/2’ goal requires the holes to be 12’4” apart on cen-
ter, and the 9’ x 4 1/2’ goal requires the holes to be 9’4” apart on center. 

 
9.  Plan on having 2” x 4” wood bracing materials available prior to mixing the concrete to help insure that the 

Uprights

 (B) are plumb and the 

Crossbar

 (A) is level and at the correct height.   

 
10. If you are not using 

Optional SC44S Ground Sleeves 

(F) proceed to instruction number 12. 

11. When installing 

Optional SC44S Ground Sleeves

 (F) it is critical that the ground sleeves are precisely posi-

tioned in the concrete footing to insure easy installation and removal of the goal.  For best results slide the 
ground     

Optional Ground Sleeves

 (F) onto the complete assembled goal and temporarily attach with duct 

tape to the 

Upright

 (B).  Place the entire goal / ground sleeve assembly into the concrete footing using 2” x 4” 

wood  bracing to insure that everything is plumb, level, the correct height, and properly positioned to the field. 

 
12. It will take approximately three to four 1/3 cubic feet bags of concrete for each hole depending on the actual 

size you dig your holes.  Please allow 7 days for the concrete to completely cure before removing wood     
bracing. 

 
13. To install the net position 

Net Attachment Clips 

(P) into the slots in each 

Upright

 (B), and 

Crossbar 

(A)       

approximately 12” - 18” apart. The 

Net Attachment Clips 

(P) slip into the slot and twist 90° into position with 

the opening to the outside of the goal.  See Figure 3. 

 
14. Using the 

Net Ground Stakes

 (O), evenly spaced, anchor the bottom of your net to the turf. 

 
 
 
 
 
 
 
 

 
 

NOTE: 

If using 

Optional SC44S Ground Sleeves 

(F) use cap to protect 

Optional SC44S Ground Sleeves 

(F) when goal is removed. 

Отзывы: