background image

Page 2

 

9.

 

Install the 

Backboard Mounting Bracket 

(B), 

Backboard 

(Q), and 

Rim 

(R) 

assembly onto the end of the 

Gooseneck 

Pole 

(A). It is easiest to install the 

assembly upside down and then rotate 

180° before installing and tensioning the 

1/2” 

Square Head Set Screws 

(O). 

Confirm that the 

Rim 

(R) and 

Backboard 

(Q) are level before tightening the 

1/2” 

Square Head Set Screws 

(O) against the 

Gooseneck Pole 

(A). Install and tighten 

the 

1/2” 

Jam Nuts 

(P) to lock the 

1/2” 

Square Head Set Screws 

(O) in place. See 

Figure 4 

 

Figure 2

 

5.

 

Attach one 

Band Clamp

 (C) with 

5/16” 

2” 

Carriage Bolt

 (H), and 

5/16” 

Flange Nut

 (I) 

approximately 

12” 

from the bottom end of 

pole and insert pole into concrete while 

vibrating concrete to allow it to surround the 

pole completely. The horizontal extension 

section of the pole should be parallel to the 

playing surface, perpendicular to the 

intended court end line and the lower 

surface of the horizontal portion of the tube 

should be 

9’ 

6 1/2

 above the playing 

surface. You will need to brace the pole to 

maintain this dimension to insure the rim 

height will be at official 

10’. 

 

      See Figure 1 & 2

 

6.

 

Trowel the top of the concrete smooth and 

clean any excess off the 

Gooseneck Pole 

(A). 

Allow the footing to cure for at least 

48 hours. 

Do not proceed any further until 

concrete is completely cured.

 

8.

 

Slide two 

Band Clamps 

(C) onto the 

horizontal portion of the 

Gooseneck Pole 

(A). See Figure 4.

 

7.

 

Attach the 

Rim 

(R) and 

Backboard 

(Q) to 

the 

Backboard Mounting Bracket 

(B) using 

the hardware provided with the 

Rim 

(R). 

 

      See Figure 3.

 

Figure 3

 

Figure 1

 

Отзывы: