
ECO Cooling Solutions
INSTALLATION GUIDE
ENG
6
>
7
>
PRECAUTIONS AND SAFETY
•
Any maintenance or repair installation must be performed by a person or
qualified firm.
•
The packaging of the evaporative may be a danger to the security of the
storage. Please place them in areas according to local laws and regulations.
•
Maximum load capacity allowed for loading equipment or lifts must be taken
into account .
•
Use in all the installations raise elements (erecting cranes, electrical arms)
and loading equipment such as controlled pulleys and with the fulfillment of
the regulation.
Other important requirements
Please read this manual carefully. Failure to do so may result in an injury or damage
to the evaporative, the evaporative or the property of the costumer.
•
Do not force any part of the evaporative to enter because everything is
designed for an easy handling and placement.
•
•
Never pierce the bottom of the tank or the side panels unless otherwise
indicated, as they directly affect the functioning of the evaporative causing its
replacement.
•
•
Check the area of placement of the evaporative, to ensure that the structure is
safe and capable of supporting the weight of the evaporative.
•
•
Always comply with the standards and local regulations.
DIAGRAMS/CUTTING
1. Cover
2. Water distributor
3. Ozone
4. CPMD electronics
5. Water sensor
6. Drainage
7. Water tank
8. Corner post
9. Axial Motor
10. Fixation set
11. Water pump
12. Filter
13. Water Inlet Valve
14. Side Panell
15. Impulsion internal probe
BIO
1
2
8
4
5
6
3
9
10
7
11
12
13
14
15