INSTRUCTION MANUAL

Catalog Numbers

165-1781
165-1782
165-1789
165-1790

HYDROTECH™ VACUUM PUMP

HydroTech Vacuum Pump

Содержание HYDROTECH

Страница 1: ...INSTRUCTION MANUAL Catalog Numbers 165 1781 165 1782 165 1789 165 1790 HYDROTECH VACUUM PUMP HydroTech Vacuum Pump...

Страница 2: ...roubleshooting 7 3 1 Maintenance 7 3 2 Troubleshooting Guide 8 Appendix A Approximate Gel Drying Times 9 Appendix B Specifications 10 Appendix C Warranty and Ordering Information 11 Figures 1 HydroTec...

Страница 3: ...the user Bio Rad is not responsible for any injury or damage caused by the use of this instrument for purposes other than for which it is intended or by modifications of the instrument not performed b...

Страница 4: ...nce free All parts are corrosion resistant for long life and trouble free operation Figure 1 HydroTech Vacuum Pump 1 1 FEATURES The HydroTech Vacuum Pump features include No vapor or liquid trap requi...

Страница 5: ...fitting and 1 4 vacuum tubing 3 Two way Prevents foaming when the HydroTech is operating but the gel dryer is not in use Valve This valve is plumbed into the vacuum line 4 Power On This switch can be...

Страница 6: ...re building up in the reservoir 3 Reservoir Quick disconnect valve for draining the Reservoir Drain Port 4 AC Power Three prong AC power input Connection 5 Locking Casters allow the HydroTech to be mo...

Страница 7: ...nd lift the top portion of the shipping box over the vacuum pump The vacuum pump should now be fully accessible and can be easily removed from the bottom box Check the contents of the box against the...

Страница 8: ...the dryer and the vacuum pump to achieve the best pre assembled vacuum line system efficiency 7 In an easily accessible stretch This valve keeps the pump under vacuum when the of the vacuum tubing cu...

Страница 9: ...ing when the vacuum is valve to the Closed position running but the gel dryer is not in use 3 Position the gel in the gel dryer and seal the gel dryer 4 Turn the vacuum line s two way The pump will no...

Страница 10: ...y push the drain line quick connect fitting into the Reservoir Drain Port reservoir drain port to open the drain valve See Table 2 3 Place drain line into a large Secure the open end of the drain line...

Страница 11: ...heck electrical source power connections and fuse To replace the fuse unplug the dryer Then pry open the cover on the power switch and pull out the fuse holder See Appendix B for replacement fuse spec...

Страница 12: ...ted Drying Times for Single Percentage Gels Acrylamide Concentration Slab Thickness Time at 80 C 3 to 10 0 375 mm 30 min 10 to 20 0 375 mm 30 min 3 to 10 0 5 mm 40 min 10 to 20 0 5 mm 40 min 3 to 10 0...

Страница 13: ...ns Temperature 4 to 35 C Humidity 10 to 90 relative humidity Dimensions D x W x H 40 x 25 x 51 1 cm Weight dry 14 kg 30 lbs Electrical connection 3 wire power cord Power requirements 115 V AC models 9...

Страница 14: ...e following defects are specifically excluded 1 Defects caused by improper operation 2 Repair or modification done by anyone other than Bio Rad Laboratories or their authorized agent 3 Use with fittin...

Страница 15: ...V includes Model 583 Gel Dryer HydroTech Vacuum Pump tubing and connectors 165 1790 HydroTech Gel Drying System 220 240 V includes Model 583 Gel Dryer HydroTech Vacuum Pump tubing and connectors 165 1...

Страница 16: ...852 2789 1257 India Ph 91 124 6398112 113 114 Fx 91 124 6398115 Israel Ph 03 951 4124 Fx 03 951 4129 Italy Ph 34 91 590 5200 Fx 34 91 590 5211 Japan Ph 03 5811 6270 Fx 03 5811 6272 Korea Ph 82 2 3473...