For Queries and Help please call Product Support:
01909 768 858
T10
Fold over
Corner
100mm
T10
Repeat previous stages
for this side
T10
Tack to hold
in place
70mm overhang at
each end
Fold over
Eaves
T10
Repeat previous stage
to complete the roof felt
covering.
For Shingles Roof Covering Only
Only 1 roll of felt is used
as a starter layer for the
Shingles
Cut the full roll of felt in half
lenght ways
x 1
100mm
T10
61
64
65
66
62
63
Содержание INS-0051
Страница 5: ...0 1 9 0 9 7 6 8 8 5 8 ...
Страница 6: ...0 1 9 0 9 7 6 8 8 5 8 ...