Part No. 792504
Form No. F070617B
6
Packing Checklist Continued
Parts Bag Hardware Includes:
Fig. 9
Assembly
NOTE: Items in ( ) can be referenced in the Parts Illustration and Parts List on pages 17-24.
1.
SECURELY ATTACH unit to the bed of a truck or to a trailer, so that the exhaust discharges into an
enclosed container. NOTE: This unit must be securely mounted to the bed of a truck or to a trailer before
operating.
2. ATTACH the hose boom (item 2) to hose (item 3) by sliding the boom through the rings on the top of the
housing.
3. ATTACH hose (item 3) to housing intake, using hose clamp (item 25) making sure to place the safe
-
ty switch under the clamp. Then place the clamp (item 25) over and around the end of the hose to be
attached to the housing. Slide the hose onto the housing intake and place the shut off switch under the
clamp. Make sure the shut off switch is pressed in or the vacuum will not start, and clamp the hose to the
intake. (See page 8 for illustration)
4. ASSEMBLE nozzle handle (item 6), to nozzle intake (item 9), using screw (item 7), eye bolt (item 8),
washers (item 10) and lock nuts (item 11).
5. ATTACH assembled nozzle to hose using hose clamp (item 25). Before tightening hose clamp, position
nozzle handle upward when hose is stretched to prevent twisting. Load on hose assembly during operation.
Содержание DL2900V
Страница 12: ...Part No 792504 Form No F070617B 12 Maintenance Continued Wiring Diagram...
Страница 17: ...Part No 792504 Form No F070617B 17 Parts Drawing 1...
Страница 19: ...Part No 792504 Form No F070617B 19 Parts Drawing 2...
Страница 23: ...Part No 792504 Form No F070617B 23 Parts Drawing 4...