The installation must conform with local codes or, in the absence of local codes, with the
National Fuel Gas Code, ANSI Z223.1/NFPA 54. Storage and Handling of Liquefied Petroleum
Gas and Propane Installation Code, CSA B149.1; Propane
Storage and Handling, CSA B149.2.
Gases, ANSI/NFPA 58; or Natural
7
ASSEMBLY INSTRUCTIONS
Step 1
Tips:
About instructions, most of the parts have been pre-installed before packing.
4
BB
Install (4) foot pads (4) to the main body assembly with (4) M4 x 25 bolts (BB) as illustrated.
Hardware Used
M4 x 25 bolt
4 pcs
BB
Содержание J-626
Страница 5: ...5 EXPLODED VIEW AA BB R ...
Страница 13: ...Need help call our toll free number at 1 8 or 21 5 0 7 55 17 1 ...