![BiGDUG BiG16 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/bigdug/big16/big16_manual-to-assembly-and-usage_2750512002.webp)
2
Note: Illustrations not to scale
Assembly - BiG16
1
2
3
4
5
6
7
8
9
10
11
12
Attach plastic feet
F
to bottom of
uprights
A
ensuring the keyhole in
the upright is the same way up as
the image below.
Repeat step 9 for each shelf level.
A
F
Join 2 uprights together by inserting a short
side beam
C
into the keyhole slot in the
uprights
A
at the lowest level required.
Tap the beam
C
down with a rubber
mallet ensuring that the beam rivets
are fully located at the bottom of the
keyhole slot.
Repeat steps 2-3 until you
have a ladder style end frame.
Tip:
Now is a good time
to check the space
between the beams
suits the items you want
to store on the shelves
and adjust as required
Repeat steps 2-4 to make a
second ladder style end frame.
Join the 2 end frames together by taking
long beams
B
and inserting them into
keyholes in the end frames at the same
height as the short beams
C
Using a
rubber mallet tap the beams into place.
Repeat step 6 to add
the remaining beams.
Bend over the tabs with a screwdriver
to hold supports in place.
Your shelving bay is now complete
A
C
A
C
B
Bend the centre supports beam
D
tabs at right angles then slide the centre
support beams into the slots in the long
beams
B
.
D
B
3 centre
supports
per level
Insert the chipboard decks
F
onto each level.
F
P
P
O
A
C
A
C
C
B
C
A
D
Tip:
Use the first
frame as a
template
to get the
correct
spacing
180°
Please ensure
tab is folded flat
as shown
1
2
3
Slide in
Bend to
P