Step 12: Chalk Wall Frame
A:
Attach (BR13) Back Roof Support to (BR7) Floor Back with 1 (H1) 1/4 x 1-1/2” Hex Bolt (with lock washer, flat
washer and t-nut) and to (F10) Top Front Back using 1 (PB2) 1/4 x 1-1/4” Pan Bolt (with lock washer, flat washer
and t-nut). Make sure (BR13) Back Roof Support is flush to the bottom of (BR7) Floor Back. (fig. 12.1)
Keep
bolts loose.
B:
Level (F10) Top Front Back and then attach to both (F13) Posts using 4 (S7) #12 x 2” Pan Screws (with 3/16”
flat washers). (fig. 12.2)
Under deck view
H1
Keep
loose for
chalk wall
Fig. 12.1
F10
S7
BR7
S7
Fig. 12.2
BR13
F13
F13
1 x
Back Roof Support 1 x 4 x 60-3/4”
1 x
Top Front Back 1 x 4 x 46-1/2”
BR13
Hardware
Wood Parts
1 x
1/4 x 1-1/2” Hex Bolt
(1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
4 x
#12 x 2” Pan Screw
(3/16” flat washer)
1 x
1/4 x 1-1/4” Pan Bolt
(1/4” lock washer, 1/4” flat washer , 1/4” t-nut)
H1
F10
PB2
S7
PB2
24
Содержание BALMORAL A24655E
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...Square Assembly ...
Страница 37: ...NOTES 37 ...
Страница 38: ...NOTES 38 ...
Страница 39: ...NOTES 39 ...