Connecting CH and CW separately
1. Connect the CH signal cable to output O1
1
.
2. Connect the cold water machine signal cable to
output O2
2
.
3. Set function 91 (output O1 function) to value 55 (heating
demand).
4. Set function 91.5 to value 0 (make contact ).
5. Set function 92 (output O2 function) to value 56 (cooling
demand).
6. Set function 92.5 to value 0 (make contact ).
Connecting CH and CW together
1. Connect the signal cable of the change-over system to out-
put O1
1
.
2. Set function 91 (output O1 function) to value 57.
3. Set function 91.5 to value 0 (make contact ).
If the unit switches from heating mode to cooling mode, a
signal is sent to the output.
2.7
Connecting the condensate discharge (CC C)
The units with cooling come standard with a condensate
draining pump. The condensate is drained from the unit
through a flexible hose.
1. Install a sewer connection incl. stink trap for the discharge
of condensate.
2. Connect the discharge hose
1
to the drain pipe.
In doing so, pay attention to this:
-
For proper condensate discharge, the drain pipe must
be sloping (>2%).
-
Avoid kinks in the discharge hose.
-
Above the ceiling, the discharge hose must be insulated.
3. Mount the external drip tray
2
using the supplied
screws
3
.
1
2
1
>2%
1
2
3
3