background image

UPSI-1208DPx

Revision 1-5

24

F6  Initial operation

The correct installation of the UPS has to be ensured. 

The start is accomplished by connecting the upstream power supply: 

When an input voltage higher 

than 11.5 V is connected to the input terminals, the energy storage gets queried and transmits its data. The UPS 
sets the corresponding end-of-charge voltage and releases the pack via the system present signal.After that, 
the charging of the energy storage starts.

The applied voltage at the input of the UPS is passed through to the output, reduced by a current-dependent 
voltage drop (V

OUT

 = V

IN

 - 0.6 V at maximum current). The device charges the energy storage and monitors the 

upstream voltage thresholds at the input (UPS function).

It must be ensured that the source supplies enough current to guarantee the charging process (see chapter F4 
„Dimensioning the upstream power supply“). 

Even after disconnecting the upstream source and also no voltage is measurable at the output, 
the UPS can be still powered by the energy storage. 

Содержание UPSI-1208DP Series

Страница 1: ...User Manual UPSI 1208DPx Bicker Elektronik GmbH Ludwig Auer Stra e 23 86609 Donauw rth Germany English UPS SYSTEM DIN RAIL...

Страница 2: ...ded use more detailed specified Chapter C1 Environmental conditions more detailed specified Indoor Outdoor Page 2 Warning Read User Manual at explanation Legend of used symbols supplemented 25 11 2020...

Страница 3: ...UPSI 1208DPx Revision 1 5 3...

Страница 4: ...erating Storage Transport DP2 20 65 C DP2 30 65 C DP3 20 55 C DP3 30 55 C recommended state of charge 80 Operating altitude 4000 m Max permitted humidity 95 at 25 C no dew Dimensions W H D 63 x 120 x...

Страница 5: ...attery capacitance load and temperature At very high or low temperatures a reduction of backup time occurs Unless otherwise specified the values apply to measurements at 25 C 10 15 20 25 30 35 40 45 5...

Страница 6: ...n advice 19 F2 Convection and installation position 19 F3 Description of connectors 21 F4 Dimensioning the upstream power supply 22 F5 Connecting diagram 23 F6 Initial operation 24 F7 Overview connect...

Страница 7: ...mode automatically The input voltage is passed through to the output and the integrated energy storage device is charged simultaneously The charging current depends dynamically on the load current at...

Страница 8: ...er and fire hazards and can then be used indoors and outdoors It is primary built for being mounted on a DIN Rail and is intended for professional use in applications such as industrial control commun...

Страница 9: ...put obviously damaged devices into operation e g dents burn marks rough contamination 9 Keep ventilation openings clear 10 Device must not be dropped 11 All parts of the device and accessories must n...

Страница 10: ...strength max 18 VDC Fixed connect threshold Undervoltage Voltage drop Input Output 11 5 VDC 0 6 VDC max depending on load Current consumption IN UN IOUT IN ICHARGE 0 IMAX UN IOUT ISTAT BOOST ICHARGE...

Страница 11: ...OST UN IOUT IDYN BOOST ICHARGE 0 96 W 99 W n a Short circuit proof Yes No load proof Yes Overcurrent shutdown 8 5 9 5A for max 3ms 9 5A for max 5ms OUTPUT DATA UPSI 1208DP2 UPSI 1208DP3 BATTERY MODE U...

Страница 12: ...0835 Charging method CC CV CP Nominal voltage UN 8 3 V End of charge voltage 8 3 V Charging current 16 A max Undervoltage protection 4 5 V Battery technology EDLC Nominal capacity 5 73 kJ 3 88 kJ usef...

Страница 13: ...A RELAY Connection labeling RL Switch contact potential free Relay Status configurable Power Fail Alarm Switching voltage 24 VDC 125 VAC Current carrying capacity 1 A DC 0 5 A AC State signal assignme...

Страница 14: ...ail mounting EN 60715 Housing version Aluminium Dimension W H D 63 mm 120 mm 100 mm 0 5 mm without front connectors and DIN Rail mounting bracket DATA INTERFACE RS232 Interface designation RS232 Numbe...

Страница 15: ...erature storage transport DP2 30 65 C DP3 30 55 C Max permitted humidity 95 at 25 C no dew Operating altitude 4000 m Climate class 3k3 EN 60721 Degree of pollution 2 Overvoltage category EN 61010 1 EN...

Страница 16: ...mment 4 kV 8 kV Criterion B Electromagnetic HF field EN 61000 4 3 Frequency range Test field strength Frequency range Test field strength Comment 80 MHz 1 GHz 10 V m 1 4 GHz 2 GHz 3 V m Criterion A Fa...

Страница 17: ...avior that is corrected by the device itself EMISSION ACCORDING TO EN 55016 2 3 DOMESTIC Basic standard CE Fulfilled requirements according to EN 55016 2 3 CE Domestic Conducted emission from the powe...

Страница 18: ...1208DP2 UPSI 1208DP3 63mm 120mm 9mm 100mm 44mm Tolerance 0 5 mm E Name Address Support E Mail Phone number of the manufacturer Bicker Elektronik GmbH Ludwig Auer Stra e 23 86609 Donauw rth Germany E...

Страница 19: ...orrect polarity Before commissioning check all the connections for correctness F2 Convection and installation position For these DIN rail versions vertical mounting on a horizontal rail DIN rails acco...

Страница 20: ...UPSI 1208DPx Revision 1 5 20 DIN Rail mounting and DIN Rail profile according to EN 60715 2 3 4 1 Press down...

Страница 21: ...ax 2 RXD 3 TXD 4 DTR 5 GND 6 DSR 7 NC 8 NC 9 NC RELAY CONNECTION RL The function of the relay connection is configurable via software When closing the relay the resistor value between both contacts is...

Страница 22: ...pplied from a SELV or PELV power supply In order to operate the UPS devices with complete functionality the upstream power supply has to provide at least 12V 10A and use no constant current function I...

Страница 23: ...ndividual use D Sub 9 RELAY F5 Connecting diagram VIN VOUT ATTENTION 1 Note polarity 2 AWG18 wire should be used 1 mm2 CONNECTING ORDER 1 APPLICATION VOUT 2 DC SOURCE VIN 3 RELAY USB RS232 Dismantling...

Страница 24: ...After that the charging of the energy storage starts The applied voltage at the input of the UPS is passed through to the output reduced by a current dependent voltage drop VOUT VIN 0 6 V at maximum c...

Страница 25: ...g commissioning If the device operates in battery mode and the input terminals are connected with reverse polarity no reverse polarity protection is given Overload If the load current at the output is...

Страница 26: ...charge protection With supercapacitors in particular an additional switch off threshold can take effect if the discharge current of the energy storage device is too high 15 A This can occur at very hi...

Страница 27: ...LED is off briefly pause 2s Status Reboot Output is deactivated and time until reboot runs Reboot phase UPS FAILURES Quick flashing without pause Status UPS failure Output current too low UPS is deact...

Страница 28: ...ail True Shutdown SOC Threshold Reached Max Backup Time Timeout Shutdown Timer Timeout Shutdown SOC Enabled Max Backup Enabled Shutdown Timer OS Enabled Ignition Timer Timeout Ignition Pin High True F...

Страница 29: ...acity than actually required should always be used The less deep the packs are discharged the longer the service life lasts F15 Maintenance The UPS contains no serviceable parts In case of a malfuncti...

Страница 30: ...a not intended Power Fail could be caused With maximum load the voltage at the input of the device must not undercut 11 5V Even after the upstream supply has been disconnected the device continues to...

Страница 31: ...ions Windows is a registered trademark of the Microsoft Corp Status as at 01 04 2021 Revision 1 5 Bicker Elektronik GmbH Ludwig Auer Stra e 23 86609 Donauw rth Germany Tel 49 0 906 70595 0 Fax 49 0 90...

Отзывы: