Addendum sheet M7917 issue 2.3 Page 2 of 3
4
Unscrew and remove the cable clamp bridge found with in the IEC plug. Reserve for
use later.
5
Feed the wires through the rubber grommet of the IEC plug. Connect the wires to the
terminals as illustrated. Ensure the plug terminal screws are fully tight and the cable is
secure.
6
Refit the cable clamp bridge to the IEC plug.
7
Fasten the plug top to the casing using the retention screw removed previously.
8
Loosen the screws in the empty positions of the heating tape terminal block.
See Figure 1, 3 and 4 illustrations.
Or
Open up the case by unscrewing and removing the fastening screw found in the
connection housing.
See Figure 2 illustration.
Loosen the screws in the empty positions of the terminal block.
Unscrew and remove the cable bridge clamp.