Biasi B40/10 Скачать руководство пользователя страница 19

PAGE 19 

BIASI B/40 

 

 

 

1. 

On/Off Switch 

— Turns power to control panel on and off and will disable power to the burner 

assuming the panel is wired correctly. 

2. 

Minimum Boiler Temperature Thermostat 

— Maintains a minimum boiler temperature   be-

tween 50 degrees F and 170 degrees F. 

3. 

Maximum Boiler Temperature Thermostat 

— High limit temperature setting for boiler be-

tween 50 degrees F and 205 degrees F. 

4. 

Thermostat Test Button 

— This button jumps out both thermostats allowing a technician to eas-

ily start the burner for testing if there is no call for heat.  Warning, with both thermostats disabled 
the only high limit left will be the manual high limit. 

5. 

Circulator Switch

 - Supplies power to boiler circulator or relay panel.  It is not suggested to use 

this switch and it is not utilized in any of the suggested wiring diagrams in this manual. 

6. 

Boiler On/Off Signal Lamp

 — Signal lamp to indicate whether main power switch is turned on 

or off. 

7. 

Temperature Gauge

 - Temperature gauge which takes temperature reading from top front of 

boiler. 

8.  Manual Reset High Limit 

-  Safety high limit that is set to 214 degrees F.  If the manual high 

limit is tripped, use a flat head screw driver to protective cap on reset button.  Then depress reset 
button making sure that it stays depressed once you have removed your finger.  Once the switch is 
reset replace the protective cover.

 

9.  Burner Lock Out Signal Lamp

 - Lamp to indicate if the burner has gone out on lockout. 

 

CONTROL PANEL DESCRIPTION 

All manuals and user guides at all-guides.com

Содержание B40/10

Страница 1: ...SMOUTH NH 0380 PORTSMOUTH NH 03801 1 1 1 PHONE 603 PHONE 603 PHONE 603 PHONE 603 334 334 334 334 6400 6400 6400 6400 FAX 603 FAX 603 FAX 603 FAX 603 334 334 334 334 6401 6401 6401 6401 Boiler Manual A...

Страница 2: ...fic recommendations We realize that other makes and models of such devices are available and can be used as successfully as those we specify The installing contractor is the best judge of a system s s...

Страница 3: ...Block Assembly 6 8 Boiler Trim Kit Installation 7 8 Boiler Tapping Diagram 9 Burner Set up 8 10 Gas Piping 9 12 Breeching and Chimney 10 14 Piping 11 15 Boiler Jacket Assembly 12 17 Boiler Jacket Expl...

Страница 4: ...n the installation is completed Do not burn volatile garbage gasoline naphtha or other flammable liquids other than No 2 fuel oil All flammable liquids especially gasoline chemicals rags paper wood sc...

Страница 5: ...ay not experience any symptoms only one symptom or a few symptoms Suspect the presence of carbon monoxide if symptoms tend to disappear when you leave your home The following signs may indicate the pr...

Страница 6: ...LBS B40 6 6 265 2 20 308 230 86 0 17 34 8 902 B40 7 7 352 2 90 406 305 86 7 20 39 5 1023 B40 8 8 437 3 60 504 380 86 8 23 44 4 1144 B40 9 9 524 4 30 602 456 87 0 26 49 2 1265 B40 10 10 610 5 00 700 53...

Страница 7: ...oms should incorporate two 2 permanent air supply openings one commencing within 12 inches of the ceiling and one commencing within 12 inches of the floor These openings should freely communicate with...

Страница 8: ...alled on the bottom of the boiler The bottom draw rods should not extend past the front section Draw the sections together until sections make iron to iron contact at a point around the top and bottom...

Страница 9: ...on of the front and rear boiler tappings Boiler Model Length L B 40 6 34 8 B 40 7 39 5 B 40 8 44 5 B 40 9 49 2 B 4 10 53 9 B 4 11 58 8 B 4 12 63 9 2 5 MPT Return 2 5 MPT Supply 8 Breech Control Panel...

Страница 10: ...2 25 X 60 2 75 X 60 3 25 X 60 3 75 X 60 4 5 X 45 5 50 X 45 Spray Pattern solid solid solid solid solid solid solid Pump Pressure 140 psi 170 psi 175 psi 175 psi 175 psi 160 psi 140 psi Head Position...

Страница 11: ...rod settings against manufacturer s specs to insure proper operation 2 Installing properly sized gas piping according to BTU input required and length of gas line run 3 Making sure there is proper man...

Страница 12: ...gas piping for various lengths and diameters Locate a drop pipe adjacent to but not in front of the boiler Locate a tee in the drop pipe at the same elevation as the gas inlet connection to the boiler...

Страница 13: ...ution The gas valve should not be subjected to more than PSIG Therefore the burner should be isolated during high pressure gas leak tests The appliance and its individual shut off valve must be discon...

Страница 14: ...emp so caution should be used when connecting to an outside built chimney Should you have concern that the flue gases could condense then you should consider using a listed power venting unit If power...

Страница 15: ...uitable hangars and floor stands not by the boiler It is recommended that the make up water line have a backflow preventer and a pressure reducing valve to reduce line pressure to 10 to 15 psi install...

Страница 16: ...BIASI B 40 PAGE 16 All manuals and user guides at all guides com a l l g u i d e s c o m...

Страница 17: ...d hex spacers 87 onto the studs Attach the lower mounting bracket 83 to the boiler by using two bolts 89 and screw ing them into the threaded hex spacers Then using sheet metal screws attach the lower...

Страница 18: ...dicated breaker in the electric service box A service switch should be mounted on the side of the boiler so the burner man can service the burner and controls The electrical wiring should be routed so...

Страница 19: ...Circulator Switch Supplies power to boiler circulator or relay panel It is not suggested to use this switch and it is not utilized in any of the suggested wiring diagrams in this manual 6 Boiler On O...

Страница 20: ...BIASI B 40 PAGE 20 B 40 Control Panel Wiring Diagram for Beckett Heat Wise Oil Burner 24V CIRCULATOR RELAY BURNER CONTROL All manuals and user guides at all guides com...

Страница 21: ...PAGE 21 BIASI B 40 B 40 Control Panel Wiring Diagram for Beckett Heat Wise Oil Burner Line Voltage CIRCULATOR RELAY BURNER CONTROL All manuals and user guides at all guides com a l l g u i d e s c o m...

Страница 22: ...BIASI B 40 PAGE 22 B 40 Control Panel Wiring Diagram for Riello Oil Burner All manuals and user guides at all guides com...

Страница 23: ...PAGE 23 BIASI B 40 B 40 Control Panel Wiring Diagram for Heat Wise Gas Burners CIRCULATOR RELAY Burner Primary Control All manuals and user guides at all guides com...

Страница 24: ...ush and vacuum combustion chamber and flue passages until all deposits are removed Reassemble components in reverse order making sure any damaged gaskets are repaired or replaced Other maintenance req...

Страница 25: ...________________ _________________________ ______________________ Burner Manufacturer Type of Oil Burner Burner Model No Burner Serial No Nozzle Manufacturer Nozzle Spray Angle G P H Type Burner Perfo...

Страница 26: ...BIASI B 40 PAGE 26 All manuals and user guides at all guides com a l l g u i d e s c o m...

Страница 27: ...PAGE 27 BIASI B 40 All manuals and user guides at all guides com...

Страница 28: ...er and that installation conforms to all codes and ordinances 4 This warranty does not apply to boilers which are subject to misuse abuse neglect alteration accident excessive temperature excessive pr...

Отзывы: