- 43 -
INST
ALLA
TION
- 43 -
INST
ALLA
TION
GENERAL REQUIREMENTS
carried out by a competent person and be in
accordance with the current I.E.E. Regula-
tions and any local regulations which apply.
Reference should be made to the current
ETCI rules for electrical installations.
For Ireland (IE), refer to I.S.813.2002.
The boiler is supplied for connection to a
230 V~ 50 Hz supply. The supply must be
fused at 3A.
The method of connection to the electricity
supply must facilitate complete electrical
isolation of the appliance by the use of a
fused spur isolation switch. Its installation
permits a complete switching off in the con-
ditions of the overvoltage category III. Alter-
natively it can be used a 3A fused three pin
plug and unswitched shuttered socket outlet
both complying with BS 1363.
The point of connection to the electricity
supply must be readily accessible and adja-
cent to the appliance, except where the ap-
pliance is installed in a bathroom, this must
then be sited outside the bathroom.
Содержание Activ A 30C
Страница 83: ... 83 MAINTENANCE MAINTENANCE Fig 9 25 Winter Summer ...
Страница 84: ... 84 NOTES ...
Страница 85: ... 85 NOTES ...