background image

ISTRUZIONI D’USO E DI INSTALLAZIONE INSTALLATION AND USER’S MANUAL INSTRUCTIONS D’UTILISATION ET D’INSTALLATION INSTALLATIONS-UND GEBRAUCHSANLEITUNG INSTRUCCIONES DE USO Y DE INSTALACION INST

ALLA

TIE

VOORSCHRIFTEN

        

ATTUATORE PER CANCELLI SCORREVOLI A CREMAGLIERA

ACTUATOR FOR RACK SLIDING GATES

ACTIONNEUR POUR PORTAILS COULISSANTS A CREMAILLERE

TRIEB FÜR SCHIEBETORE MIT ZAHNSTANGE

SERVOMOTOR  PARA CANCELAS CORREDERAS DE CREMALLERA

ACTUATOR VOOR SCHUIFHEKKEN MET TANDHEUGEL

Attenzione!

 Leggere attentamente le “Avvertenze” all’interno! 

Caution! 

Read “Warnings” inside carefully! 

Attention!

 Veuillez lire attentivement les Avertissements qui se trouvent à l’intérieur! 

Achtung!

 Bitte lesen 

Sie aufmerksam die „Hinweise“ im Inneren! 

¡Atención¡

 Leer atentamente las “Advertencias” en el interior! 

Let op! 

Lees de “Waarschuwingen” aan de binnenkant zorgvuldig!

D812860 00100_03 30-05-19

IC

AR

O SM

AR

T A

C A2000

IC

AR

O UL

TR

A A

C A2000

Содержание ICARO SMART AC A2000

Страница 1: ...FÜR SCHIEBETORE MIT ZAHNSTANGE SERVOMOTOR PARA CANCELAS CORREDERAS DE CREMALLERA ACTUATOR VOOR SCHUIFHEKKEN MET TANDHEUGEL Attenzione Leggere attentamente le Avvertenze all interno Caution Read Warnings inside carefully Attention Veuillez lire attentivement les Avertissements qui se trouvent à l intérieur Achtung Bitte lesen Sie aufmerksam die Hinweise im Inneren Atención Leer atentamente las Adve...

Страница 2: ...UALE MANUEL D UTILISATION MANOVRA MANUALE BEDIENUNGSANLEITUNG MANOVRA MANUALE MANUEL DE USO MANOVRA MANUALE MANUAL PARA DE USO MANOVRA MANUALE A FIG 2 H 180 OPEN B C D CLOSE 180 F E G click ON OFF 2 ICARO SMART AC A2000 ICARO ULTRA AC A2000 D812860 00100_03 ...

Страница 3: ...E ARRANGEMENT PRÉDISPOSITION DES TUYAUX VORBEREITUNG DER LEITUNGEN DISPOSICIÓN DE TUBOS VOORBEREIDING LEIDINGEN PREDISPOSIZIONE FISSAGGIO MOTORE PREPARATION FOR MOTOR MOUNTING AMÉNAGEMENT FIXATION MOTEUR VORBEREITUNG MOTORBEFESTIGUNG DISPOSICIÓN FIJACIÓN DEL MOTOR VOORBEREIDING BEVESTIGING MOTOR Cremagliera Rack Crémaillère Zahnstange Cremallera Tandheugel MONTAGGIO MOTORE MOUNTING THE MOTOR MONTA...

Страница 4: ...FIN DE COURSE DRT ET GCH BEFESTIGUNG BÜGEL ANSCHLÄGE RECHTS UND LINKS FIJACIÓN ABRAZADERAS FINAL DE CARRERA DER E IZQ BEVESTIGING STANGEN AANSLAG RECHTS EN LINKS COLLEGAMENTO MORSETTIERA TERMINAL BOARDWIRING CONNEXION PLAQUE À BORNES ANSCHLUSS KLEMMLEISTE CONEXIÓNTABLERO DE BORNES AANSLUITING AANSLUITKAST Solo per only for uniquement sur nur fü solo para apenas para ICARO SMART AC A2000 Solo per o...

Страница 5: ...7 5 40 107 60 11 178 Z25 Ø p100 Z18Øp72 65 152 Min 127 mm Z18 Min 141 mm Z25 20 Min 94w mm 2mm NO OK 26 226 215 26 35 35 55 35 26 5 10 8 39 22 10 8 186 6 centro pignone center pinion le pignon de centre ritzelachse centro pinon het centrum rondsel ICARO SMART AC A2000 ICARO ULTRA AC A2000 5 D812860 00100_03 ...

Страница 6: ...04142 43 50 51 52 Y GND M B N MARRONE BLU NERO BROWN BLUE BLACK MARRON BLEU NOIR BRAUN BLAU SCHWARZ MARRÓN AZUL NEGRO BRUIN BLAUW ZWART R M N ROSSO MARRONE NERO RED BROWN BLACK ROUGE MARRON NOIR ROT BRAUN NERO ROJO MARON NEGRO ROOD BRUIN ZWART ICARO ULTRA AC A2000 Solo per only for uniquement sur nur fü solo para apenas para ICARO SMART AC A2000 6 ICARO SMART AC A2000 ICARO ULTRA AC A2000 D812860 ...

Страница 7: ...quote riportate in FIG B Per mantenere in posizione corretta la piastra base durante la posa in opera può risultare utile saldare due piatti di ferro sotto il binario sui quali poi saldare i tirafondi FIG I 5 MONTAGGIO MOTORE FIG C C1 6 MONTAGGIO ACCESSORI TRASMISSIONE FIG D D1 7 CENTRAGGIO CREMAGLIERA RISPETTO AL PIGNONE FIG J K1 L PERICOLO L operazione di saldatura va eseguita da personacapaceed...

Страница 8: ...ssembly keeping to the distances featured in FIG B Tokeepthebaseplateintherightpositionduringinstallation it may be useful to weld two iron plates under the track to which the anchors can then be welded FIG I 5 MOUNTING THE MOTOR FIG C C1 6 MOUNTING DRIVE ACCESSORIES FIG D D1 7 RACK CENTRING WITH RESPECT TO PINION FIG J K1 L DANGER Welding must be performed by a competent person issued with the ne...

Страница 9: ...G B Pourmaintenirenplacelaplaquependantlapose vouspouvez aussi souder deux plats en fer sous le rail sur lesquels vous souderez les tirefonds Fig I MANUEL D INSTALLATION 5 MONTAGE MOTEUR FIG C C1 6 MONTAGE ACCESSOIRES TRANSMISSION FIG D D1 7 CENTRAGE CRÉMAILLÈRE PAR RAPPORT AU PIGNON FIG J K1 L DANGER L opération de soudage doit être confiée à une personne compétente et munie de tous les équipemen...

Страница 10: ...die auf Fig B angegebenen Abmessungen ZurEinhaltungderrichtigenPositionderGrundplattewährend der Montage kann es hilfreich sein zwei Eisenplatten unter die Schiene zu schweißen an die dann die Verankerungen angeschweißt werden Fig I 5 MONTAGE MOTOR Fig C C1 6 MONTAGE ANTRIEBSZUBEHÖR Fig D D1 7 ENTRIERUNGDERZAHNSTANGEMITBEZUGAUFDASRITZEL Fig J K1 L GEFAHR DieSchweißarbeitenmüssenvonqualifiziertem P...

Страница 11: ...as cotas indicadas en la FIG B Para mantener en posición correcta la placa de apoyo durante la colocación en obra puede ser útil soldar dos discos de hierro debajodelavíasobrelacualluegosesueldanlostirafondosFIG I 5 MONTAJE MOTOR FIG C C1 6 MONTAJE ACCESORIOS TRANSMISIÓN FIG D D1 7 CENTRADO CREMALLERA RESPECTO AL PIÑÓN FIG J K1 L PELIGRO La operación de soldadura debe ser realizada por una persona...

Страница 12: ...oep met inachtneming van de afstanden vermeld in FIG B Omdevoetplaatindejuistepositietehoudentijdensdeinstal latie kan het nuttig zijn twee ijzeren plaatjes onder de rail te lassen omdaaropvervolgensdeankerboutentelassen FIG I 5 MONTAGE MOTOR FIG C C1 6 MONTAGE ACCESSOIRES OVERBRENGING FIG D D1 7 CENTRERINGTANDHEUGELT O V DERONDSELASFIG J K1 L GEVAAR De laswerkzaamheden dienen te worden uitgevoerd...

Отзывы: