Transport, Installation and Connection
4-14
10
1
6
8
2
7
12
5
13
15
10
4
11
3
9
4.8.4 Laying
the special cable KW6 for Ex-proof
housings
The outer braided shield shall be clamped
between clamp collar I & II on the scanner side.
Assembly:
First the cable and the clamp collars must be
fixed with screwed cap I.
On the second stage the PUR sheath must
be tightend with screwed cap II.
The inner screening shall be cut of on the scanner
side and connected to ground at the flame controler.
No.
Item
No. Item
1
Screwed coupler
8
Screwed cap 2
2
Rubber casket 1
9
PUR cable sheath
3
Clamp collar 1
10
Ex de IIC housing
4
Outer braided shield
11
wire end ferrule
5
Clamp collar 2
12
heat-shrinkable tubing
6
Screwed cap 1
13
cable gland
Reg.-No.: Ex-dIIC
ISSEP 96D.103.1226
7
Rubber casket 2
Содержание CFC 3000L
Страница 2: ......
Страница 11: ...General aspects 1 7 1 8 Declaration of conformity...
Страница 24: ...Technical data 3 6...
Страница 27: ...Transport Installation and Connection 4 3 4 6 Space requirement See following illustration Standard housing...
Страница 40: ...Transport Installation and Connection 4 16...
Страница 45: ...Description 5 5 5 4 1 Image of a BUS system...
Страница 48: ...Operation of the Compact Flame Controller 6 2...
Страница 50: ...Care and Maintenance 7 2...
Страница 52: ...Failures 8 2...
Страница 57: ...Accessories 10 3...
Страница 58: ...Accessories 10 4...
Страница 59: ...Accessories 10 5...
Страница 60: ...Accessories 10 6 BFI Automation 2020...