6
7
(4) Oil Absorbent Sheet
Place an Oil Absorbent Sheet at the bottom of the
lubricating and cleaning chamber of the Control Unit as
shown in Fig.7.
The Oil Absorbent Sheet absorbs the excess Maintenance
Oil.
(5)Connecting Power Cord
Insert the Power Cord into the Power Inlet at the
back of the Control Unit. (Fig. 8)equipo (Fig. 8)
CAUTION
Be sure to remove the bur from the
handpiece before connecting it to
each connector.
4. Operation Procedures
(1) Attaching Handpiece
Attaching air turbine handpiece (according to ISO 9168)
1) Remove the bur from the handpiece.
2) Open the Door of the Control Unit, attach the handpiece
to the connector and tighten the nut securely. (Fig. 9)
3) Close the Door securely.
* Shown with Door removed. Fig.7
Fig.8
*HPL2010 Fig.9
Oil Absorbent Sheet
Power Inlet
Connector
Nut
Tighten
Power Cord jack